BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 22, 2020 at 7:00 PM

Updated February 1, 2024

Site work and paving for a mixed-use development in Chandler Hts, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of December 08, 2020, project has not been awarded. Project is expected to be awarded on Dec. 10th, 2020 to Pulice Construction in the amount of $17,174,000.** For Cooper Road Improvements - Riggs Road to Alamosa Drive Project Work under this contract includes: The Cooper Road Improvements - Riggs Road to Alamosa Drive project is located in the City of Chandler in Maricopa County. The proposed work consists of improving Cooper Road to a four-lane roadway with a raised or flush center median. The work includes subgrade preparation, grading, furnishing and placing aggregate subbase, asphaltic concrete and Portland cement concrete paving, curb and gutter, sidewalk, drainage improvements, street lighting, traffic signals, signal interconnect; signing, pavement markings, landscaping, landscape irrigation, walls/fences, utility relocations, water main replacement, sanitary sewer pipeline extension, erosion control, and other related incidental work. Work must be completed within 450 consecutive calendar days from the Notice to Proceed. The Engineer's Estimate range is $ 12,000,000 - $ 15,000,000. This is a Federal Funded Project with DBE requirements. Pre-Bid Meeting: None Bids must be submitted on the Proposal Form provided and be accompanied by the Bid Bond for not less than ten percent (10%) of the total bid, payable to the City of Chandler, Arizona, or a certified or cashier's check. PERSONAL OR INDIVIDUAL SURETY BONDS ARE NOT ACCEPTABLE. The successful bidder will be required to execute the standard form of contract for construction prior to Council award. In addition, the successful bidder must be registered through Arizona Procurement Portal (APP) Online. Information and training on APP is available online . The successful bidder must furnish a Payment Bond and Performance Bond in the amount equal to one hundred percent (100%) of the Contract Price. The right is hereby reserved to accept or reject any or all bids or parts thereto, to waive any informalities in any proposal and reject the bids of any persons who have been delinquent or unfaithful to any contract with the City of Chandler. All Bids will remain open for 90 days after the Bid opening day, but the CITY may, in its sole discretion, release any Bid and return the bid security prior to that date. No Bidder may withdraw his Bid during this period without written permission from the CITY. Protest Policy - A protest of a proposed award must be filed WITH THE PURCHASING OFFICE within 5 calendar days of the first posting of the award recommendation. Award recommendations are posted on the Purchasing web site or the City Clerk web site. If the due date occurs on a weekend or holiday the protest must be filed the next business day. A protest must include: (1) name, address, and telephone number of the protester; (2) signature of the protester or its representative; (3) identification of the project and the solicitation or contract number; (4) detailed statement of the legal and factual grounds of the protest including copies of relevant documents; and (5) form of relief requested. City will review the protest and issue a written response. Questions Due: October 16, 2020 at 5:00 p.m. local Arizona time

Award

Roads / Highways

$17,174,000.00

Public - City

Paving, Site Work

217

21

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2020

December 28, 2020

Project location map

N Cooper Rd, Chandler Hts, AZ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.