BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 28, 2021 at 7:00 PM

Updated September 15, 2023

Site work, paving and outdoor lighting for a mixed-use development in Houston, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for outdoor lighting for a road / highway.

**As of 1/28/2021 project was already awarded, Start date and end date is 3/2021-6/2023. The Shepherd Drive Utility and Civil Improvements project consists of a conversion from overhead to underground facilities as well a full reconstruction of Shepherd Drive and Farnham Street. The utility improvements include removing overhead powerlines and telecommunication (telecom) lines and converting to underground facilities. The civil improvements include installation of new storm sewer, water line, roadway reconstruction, new traffic signals, new sidewalks, landscaping, street lighting, pedestrian lighting, upgraded METRO bus stop shelters, and will include removing temporary utility asphalt pavement placed in this project. The limits of work are along South Shepherd Drive between Westheimer and US 59, Farnham Drive between Greenbriar and South Shepherd Drive, and along adjacent side streets including: Lexington, Norfolk, Portsmouth, Richmond, Colquitt, West Main, Branard, Sul Ross, Alabama, Marshall, Kipling, Harold, and McDuffie. South Shepherd, Farnham Drive, and the adjacent side streets consist of existing asphalt pavement. Temporary asphalt pavement will be placed only where existing street pavement and sidewalks are disturbed for the overhead to underground conversions. The project reconstruction will cover approximately 4,800 linear feet mostly within the Shepherd public right-of-way and approximately 800 linear feet within the Farnham public right-of-way. The Engineers estimate is between $20 Million and $25 Million. MBE+SBE goal for the project is 17%. DBE goal is 14%.

Award

Roads / Highways

$23,000,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

113 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
369
Active Projects
200
Bidding Soon
3,439
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2020

March 3, 2021

Project location map

Farnham St & Shepherd Dr, Houston, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.