Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 29, 2021 at 7:00 PM

Updated May 6, 2025

Site work for a water / sewer project in Marina del Rey, California. Completed plans call for site work for a water / sewer project.

Power Engineering Construction Co. (An Equal Opportunity Employer) is seeking sub-trade and material supplier bids on all trades from all qualified & certified Subcontractors and Suppliers including DVBE, MBE, DBE, WBE and others. Power Engineering Construction Co. intends to seriously negotiate with all subcontractors. Each selected is required to execute Power Engineering Construction Co. the design-build subcontract. Copy of the master design-build subcontract is available for review The County of Los Angeles Department of Public Works is issuing this Request For Proposals from qualified Design-Build firms. Design-Build firms will submit Part A proposals for Marina Del Rey Public Safety Dock Replacement located at 13851 Fiji Way, Marina Del Rey, CA 90292. Please email questions to Cheryl Wong at CWONG@dpw.lacounty.gov. This is a design/build floating dock system project. Contractor shall be responsible for all design, calculations, and permitting associated with the work described in this Section. B. The Work of this Section consists, in general, of furnishing all labor, materials, equipment, tools, and incidentals required to demolish or salvage existing improvements as indicated in the Plans, including salvage of specified items, transportation, and disposal; furnishing all permits; and paying all fees; as indicated in the Plans, as specified, and as directed by the Owner. The County of Los Angeles Department of Public Works is requesting proposals from qualified firms to perform the design, construction, and warranty maintenance for the Marina Del Rey Public Safety Dock Replacement located at 13851 Fiji Way, Marina Del Rey, CA 90292. At the present time, the estimated cost range for the Design-Build contract is $7,000,000 to $9,000,000. The anticipated Contract Time for this Project is 450 calendar Days

Post-Bid

Water / Sewer

$9,000,000.00

Public - County

Site Work

87

21

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
634
Active Projects
280
Bidding Soon
4,268
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2021

October 4, 2021

Project location map

13851 Fiji Way, Marina del Rey, CA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed