BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 8, 2020 at 7:00 PM

Updated January 26, 2024

Site work for a stadium in Moapa Valley, Nevada. Completed plans call for site work for a stadium.

The work consists of furnishing all labor, materials, tools, equipment and incidentals to repair approximately 3,650 existing seat Rodeo Arena Bleachers, installing new wood sleepers under bleachers and removal of existing ADA (accessible wheelchair) seating platform and replacement with new platform at the Clark County Fairgrounds. The "Project" of which the "Work" of the Contract is a part titled Logandale Clark County Fairgrounds Rodeo Arena Bleacher Repair and is located at 1301 Whipple Ave., Logandale NV 89021. The "Work" is described in the Project Drawings and Divisions 1 through 48 of the Project Manual. The work consists of furnishing all labor, materials, tools, equipment and incidentals to repair approximately 3,650 existing seat Rodeo Arena Bleachers, installing new wood sleepers under bleachers and removal of existing ADA (accessible wheelchair) seating platform and replacement with new platform at the Clark County Fairgrounds. Construction includes all administrative work as outlined in the Division 01 General Requirements and the following using materials noted on Drawings and Specifications; includes selective demolition of various components of the existing grandstand structures, including the removal of existing ADA (accessible wheelchair) seating platform and replacement with new platform, removal of existing wood sleepers and the installation of new wood sleepers under existing bleacher sections, re-alignment of existing areas in the bleachers with gaps, trimming of toe kicks that are currently overlapping and replacement of missing bench seat end caps, welding and fabrications of various railing and support framing components, finishing and painting at repairs. The work also includes a new cane detection railing around the wall-hung air conditioning unit at the rear of the existing concession building behind the bleachers and the removal and proper disposal of waste materials and cleaning of accumulated dirt and debris under all bleachers. Work hours: The General Contractor will perform construction activities during the following times: Sunday through Saturday starting from 7:00 am to 6:00 pm (to be coordinated and verified with on-site fairgrounds supervisor). All dates and times will be outlined in the project schedule as required per Section 01 32 16. The Contractor will notify the Owner's Representative when changes to the submitted working days/hours are deemed necessary. ESTIMATED COST: $308,088.80 - $324,304.00. Question Cutoff Date: 10/26/2020 01:00 PM (ET)

Award

Arenas / Stadiums

$307,407.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
26
Bidding Soon
422
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 17, 2020

December 17, 2020

Project location map

1301 Whipple Ave, Moapa Valley, NV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.