BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 23, 2020 at 7:00 PM

Updated February 13, 2024

Renovation of a mixed-use development in Shakopee, Minnesota. Completed plans call for the renovation of a fire / police facility; library; municipal facility; and communication facility.

This project includes the replacement of the current countywide Andover Continuum access control system as well as the Stanley Gatekeeper access control system in the Law Enforcement Center. Scope includes hardware, terminations and programming for multiple projects currently under construction, retrofitting multiple existing facilities with Andover access control and adding new hardware to existing facilities currently without access control. There will be roughly 350 card readers in total. Additionally, the County seeks to migrate from Indala credentials to high frequency smart cards for approximately 1,000 cards Contractors are to provide their own transportation to and from each site. Members from Scott County and the design team will lead the tours. All attendees are required to wear a mask at each site. Temperature screening will take place at the LEC before entry Make proposals on the proposal forms supplied in the Project Manual. No oral, telegraphic or telephonic proposals or modifications will be considered. Submit with each proposal, a certified check or acceptable bidder's bond payable to Scott County in an amount equal to five percent (5%) of the total proposal cost. The awarded contractor will be required to furnish satisfactory Labor and Material Payment Bond, and Performance Bond The Owner requires Substantial Completion for the various sites as noted below:Software Headend by February 15, 2021Government Center West by March 5, 2021Law Enforcement Center by April 2, 2021Libraries with existing Andover access control system by May 28, 2021Marschall Road Transit Station by May 28, 2021Public Works by May 28, 2021Regional Training Range by May 28, 2021Libraries without existing Andover access control system by July 2, 2021Savage Radio Tower by July 2, 2021Government Center East by November 19, 2021Justice Center non-renovated areas by January 14, 2022Justice Center renovated areas by May 13, 2022

Award

Fire / Police

$726,311.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
249
Active Projects
160
Bidding Soon
1,543
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2020

November 13, 2020

Project location map

Multiple Locations, Shakopee, MN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.