Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 28, 2026 at 7:00 PM
Updated January 30, 2026
Site work and paving for a road / highway in Wilson, Wyoming. Completed plans call for paving for a road / highway; and for site work for a road / highway.
The Project consists of the construction of a multi-use pathway that is up to 18,900 linear feet in length, up to 11,200 linear feet of retaining walls (up to 10-feet high), up to 5,200 linear feet pathway handrails, storm drainage culverts, erosion control, revegetation, and possibly a 75 linear foot 12-foot X 8-foot precast box culvert with wingwalls under Wyoming Highway 22. The Project extends primarily along the south side of Wyoming Highway 22 from the terminus of the Idaho Teton Pass Trail at the Trail Creek Campground toward a potential new Highway 22 pedestrian underpass connecting to the Coal Creek Trailhead within Teton County, Wyoming. Final Project construction scope and extent will be dependent upon GMP pricing and available funding. Preconstruction Services include review of current 95% plans, advisement on constructability and plan completion, and the development of a binding GMP to be established on the basis of the Contract Documents that are at 95%. A major function of the CMAR is to assist the Owner in defining the final project scope and extent that can be completed based upon available funding. The Preconstruction Services WORK shall include services described in the RFP document, Exhibit A - Scope of Services. Preconstruction Services will be provided on a time and materials basis, based upon a proposed fee with agreed upon hourly billing rates. A future amendment to the CMAR contract may be presented to the Teton County Board of County Commissioners for consideration, which will include Construction Services based upon the GMP established during the Preconstruction Services phase. The final GMP contract for construction of the project will be negotiated with the selected CMAR or rejected at the Owner's discretion. Teton County reserves the right to reject any and all proposals and to waive all informalities. Teton County, Wyoming will select the CMAR that, in its opinion, demonstrates the highest level of qualifications to best perform this Project. Questions may be submitted via online by Monday, January 26, 2026 at 5pm MST. Responses will be issued by Wednesday, January 28, 2026 at 5:00pm MST. Teton County reserves the right to reject any and all proposals and to waive all informalities. Teton County, Wyoming will select the CMAR that, in its opinion, demonstrates the highest level of qualifications to best perform this Project. The anticipated construction start is spring 2026 and the project must be completed by July 2027.
Post-Bid
Roads / Highways
$1,000,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 29, 2026
March 2, 2026
Multiple Locations, Wilson, WY
Related To This Project
Wilson, WY
--
Wilson, WY
Bid Date: Jan 08 2026
Wilson, WY
--
Wilson, WY
--
Wilson, WY
Bid Date: Jan 29 2026
Wilson, WY
--
Wilson, WY
Bid Date: Jun 26 2025
Wilson, WY
Bid Date: May 06 2025
Wilson, WY
Bid Date: Sep 29 2025
Wilson, WY
Bid Date: Dec 24 2024
Wilson, WY
--
Wilson, WY
Bid Date: Sep 12 2024
Wilson, WY
Bid Date: Oct 13 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
