Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 28, 2022 at 8:00 PM

Updated September 14, 2023

Site work and new construction of an educational facility in Seattle, Washington. Completed plans call civil work for a primary / secondary education facility.

Lydig is the GC/CM for the Rainier Beach High School Replacement Project: Rainier Beach High School project will be a new multi-story high school of approximately 300,000 sq. ft., to provide permanent space for up to 1,600 students in grades 9-12. The existing school to be demolished is approximately 188,000 sq. ft. Roughly 750 students/staff will remain on-site during the period of construction. Construction is anticipated to begin in July 2022 and be multi-phased.

Award

Educational

$283,000,000.00

Public - City

New Construction, Site Work

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
259
Active Projects
112
Bidding Soon
2,111
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2020

July 25, 2022

Project location map

8815 Seward Park Ave S, Seattle, WA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed