BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 10, 2021 at 7:00 PM

Updated November 15, 2023

Demolition, site work, renovation and addition to a water / sewer project in Croydon, Pennsylvania. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

For Croydon Wastewater Treatment Plant Expansion - General and Mechanical The work consists of the construction of Equipment Upgrades and New treatment process units to the Croydon Wastewater Treatment Plant in Bristol Township, Bucks County, PA. The work requires the coordination of the Electrical Contractor and the General Contractor under separate contract with Bristol Township. All work is to be completed in strict accordance with the Drawings and Project Manual. Work is contained under one unit-price contract for each contractor. The General Construction Contract consists of a replacement grit removal system, a secondary clarifier, a flow splitter chamber, a scum and sludge pump station, a chlorine contact tank, improvements to an existing chlorine contact tank, new valves and actuators, and relocation of the land portion of the outfall pipe. All work is to be completed in strict accordance with the Drawings and Project Manual. Work is contained under one unit-price contract for the general contractor. Owner reserves the right to reject any and all bids for any cause whatsoever, to eliminate any item or items from the contracts, and to waive any informality in the bids. No Bidder may withdraw his bid within sixty (60) days after the date set for the opening of the bids. Clarification Deadline: 12/30/2020 5:00 PM i. Removal and replacement of existing Sanitary and Storm Lines. ii. Installation of Sanitary Manholes and Storm Inlets. iii. Installation of Water Service Line and Yard Hydrant. iv. Removal of existing Monitoring Well. v. Removal and replacement of existing Grit Removal System. vi. Installation of Final Clarifier No. 3. vii. Installation of Chlorine Contact Tank No. 2. viii. Installation of Clarifier Flow Splitter Box. ix. Installation of Sludge/Scum Pump Station and Flow Meter Vault. x. Installation of Chlorine Injector Vault. xi. Replacement of existing Sodium Hypochlorite and Sodium Bisulfite Chemical Feed Pumps and Control Panels. xii. Removal and replacement of existing Handrail for Final Clarifier Nos. 1 & 2 and Chlorine Contact Tank No. 1. xiii. Installation of Concrete Walkway and Stairs for new equipment. xiv. Removal and replacement of existing perimeter 8' Chain Link Fencing. xv. Installation of Electrical Lines and Equipment

Award

Water / Sewer

$355,146.00

Public - City

Addition, Demolition, Renovation, Site Work

Subscribe For Documents

234 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
9
Bidding Soon
3,636
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2021

March 16, 2021

Project location map

1800 River Rd, Croydon, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.