BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Schuylkill Haven, Pennsylvania. Completed plans call for the renovation of a water / sewer project.

**As of January 15, 2021, construction will likely start in around March 2021. The project is awarded to the following contractors: LB Industries was awarded Contract No.1 = $3,935,983. Master Mechanical was awarded Contract No. 2 = $165,466. G.R. Noto Electrical Construction was awarded Contract No. 3 = $904,000. Total awarded amount = $5,005,449. The Project includes the following Work: The Project consists of the upgrade of a wastewater treatment plant, including demolition, excavation, concrete work, equipment installation, instrumentation, electrical work, HVAC and plumbing work and site restoration. Attention is called to the fact that prevailing minimum wage rates as determined by the Secretary of the Department of Labor and Industry must be paid by the Contractors on this project and that employees and applicants for employment shall not be discriminated against because of their race, age, color, religion, sex, national origin, or handicap. Each Bidder is required to meet the requirements of Public Works Employment Verification Act, Act 127 of 2012. CLARIFICATION DEADLINE 12/10/2020 4:00 PM Any and all steel products used or supplied in the performance of the contract or any subcontracts shall be from steel made in the United States. The Borough of Schuylkill Haven hereby reserves the right, which is understood and agreed to by all bidders, to refuse and reject any or all bids submitted, and also reserves the right to waive any informality in bids received. The Work will be substantially complete within 360 days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 420 days after the date when the Contract Times commence to run. Except as otherwise provided by law, no bidder may withdraw its bid for sixty (60) days after the Bid Due Date, unless the contract award is delayed by a required approval of another government agency, the sale of bonds, or the award of a grant or grants, in which case the Bids shall remain open to acceptance and shall be irrevocable for a period of one hundred twenty (120) days after the Bid Due Date. Estimate Contract 01: $4,000,000 Contract 02: $250,000 Contract 03: $1,000,000

Award

Water / Sewer

$5,005,449.00

Public - City

Renovation

94

2

46

13

Subscribe For Documents

115 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
100
Bidding Soon
1,595
All Active Projects
712
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2020

February 15, 2021

img_map_placeholder

214 St Charles St, Schuylkill Haven, PA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.