Demolition, site work, remodeling and addition to a fire / police facility in Reno, Nevada. Working plans call for the addition of a 50,000-square-foot fire / police facility; for the demolition of a fire / police facility; for the remodel of a fire / police facility; and for site work for a fire / police facility.
The owner has selected a Construction Manager. https://www.washoecounty.us/csd/planning_and_development/board_commission/board_of_adjustment/2020/Files/December%203,%202020%20Agenda_________________________ https://www.washoecounty.us/csd/planning_and_development/board_commission/board_of_adjustment/2020/Files/December%203,%202020%20Agenda______________ It is the intent of this Request for Qualifications (RFQ) to solicit sufficient and verifiable information from prospective providers of Construction Manager at Risk (CMAR) services to provide experienced and expert services to Washoe County Community Services Department, Engineering and Capital Projects Division, for the Truckee Meadows Fire Protection District (TMFPD) Station 37, Washoe Valley Fire Station and Administration/Maintenance Facility Expansion Projects. Description of Project: Project Name: Truckee Meadows Fire Protection District Fire Station and Admin Complex Projects Gross Building Area: +/-50,000 sq. ft. total over 3 facilities located in 3 independent locations Estimated Construction Budget: $14,000,000 for all project scope for all 3 locations General Project Description: On behalf of TMFPD, Washoe County Community Services Department (WCCSD) seeks a Construction Manager at Risk (CMAR) for pre-construction and construction management services for the Truckee Meadows Fire Protection District Fire Station and Admin Complex Projects development and construction. The preconstruction services will be performed in conjunction with the scope of services being provided by the selected Architect. The purpose of the project is the design and construction/remodel of facilities located at 3 independent construction sites. There are three (3) distinct projects related to this RFQ which are described below. Station 37 Project: The design for this project has progressed with TSK Architects through the conceptual design phase and the special use permit (SUP) has been applied for with Washoe County Community Development. The current project schedule includes completion of the SUP approval phase, during which conceptual cost estimating and scheduling/construction planning is to be completed by end of December 2020. At that time the full design scope will proceed with the selected Architectural Firm and CMAR which is expected to yield 100% CD permit sets no later than May 1, 2021 with anticipated construction commencement by July 15, 2021 with a 9 month duration. The conceptual plans have been provided in this package for reference. Washoe Consolidated Station Project: The design for this project has not started at this time and a selection is in process for an Architectural team. Initial site evaluations have been concluded. The intent for this project is to work with the CMAR and Architectural team to complete the conceptual design phase and apply for the special use permit (SUP) with Washoe County Community Development February 8, 2021. During the completion of the SUP approval phase conceptual cost estimating and scheduling/construction planning is to be conducted. Once the full approval is received for the SUP, which is expected in April 2021, the full design scope will proceed with the selected Architectural Firm and CMAR which is expected to yield 100% CD permit sets no later than September 1, 2021 with anticipated construction commencement by November 1, 2021 with a 12 month duration. A reference set of plans have been provided in this package for reference. TMFPD Administration & Maintenance Facility Project: The current project schedule will include the Owner, CMAR and Architectural Team analyzing the programming and performing facility evaluations and recommendations for design and construction by end of January 2021. At that time the full design scope can be determined based on budget availability and evaluated along with all other projects in this package and full design scope will proceed with the selected Architectural Firm and CMAR which is expected to yield 100% CD permit sets no later than October 1, 2021 with anticipated construction commencement by January 15, 2022 with a 5 month duration. Detailed information regarding schedule of dates on which it is anticipated that the separate phases of the preconstruction and construction of this public work, together with the list of the selection criteria and relative weight of the selection criteria that will be used to evaluate statements of qualifications, are available to all applicants in the bid package available from portal.
Pre-Construction/Negotiated
Fire / Police
$14,000,000.00
Public - County
Addition, Demolition, Remodeling, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 19, 2020
February 10, 2021
Multiple Locations, Reno, NV
Related To This Project
Reno, NV
Bid Date: Nov 07 2024
Reno, NV
Bid Date: Oct 22 2024
Reno, NV
--
Reno, NV
Bid Date: Nov 07 2024
Reno, NV
--
Reno, NV
Bid Date: Dec 04 2024
Reno, NV
Bid Date: Jan 13 2025
Reno, NV
Bid Date: Jul 28 2021
Reno, NV
Bid Date: Nov 15 2024
Reno, NV
Bid Date: Oct 31 2024
Reno, NV
Bid Date: Nov 07 2024
Reno, NV
Bid Date: Nov 08 2024
Reno, NV
Bid Date: Oct 21 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.