BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 7, 2021 at 7:00 PM

Updated January 26, 2024

Demolition and site work for a playground / park / athletic field in Park City, Utah. Completed plans call for the demolition of a playground / park / athletic field; and for site work for a playground / park / athletic field.

In the absence of the project manager, proposals should be dropped off to the City Recorder, located at 445 Marsac Avenue, Third Floor - Executive Department, Park City, UT 84060. The Project scope is to demolish and remove the existing buildings for the Park City Art & Culture District, at the 5.25-acre site at the Bonanza Park neighborhood. There are a total of seven (7) buildings, i.e., a gas station, five 2-story buildings, and one 1 story commercial complex. The gas station mitigation was completed by the former owner of the gas station. The testing for hazardous materials in the buildings has been completed, and the results show no sign of any hazardous materials. Site work and demolition is anticipated to begin December 28, 2020, with total project completion by March 8, 2021. Bids will be in accordance with the Drawings and Specifications as prepared for the project by MHTN Architects. Bidding documents may be obtained from Park City Municipal Corporation, Sustainability Office only via email request to Dave Gustafson at dgustafson@parkcity.org. A bid bond in the amount of five percent (5%) of the total bid is required. Specifications are currently on file and may be viewed at the Park City Municipal Sustainability Office. The successful bidder will be required to furnish performance and payment bonds in the amount equal to one hundred percent (100%) of the contract price. All questions concerning the project must be submitted in writing to Jonathan Eyzaguirre by 3:00 p.m. on Monday, November 30, 2020, via email to jeyzaguirre@cccutah.com. Park City Municipal Corporation reserves the right to reject any and all proposals for any reason and to waive any minor irregularities in any proposal

Bid Results

Playgrounds / Parks / Athletic Fields

$218,600.00

Public - City

Demolition, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
62
Bidding Soon
1,038
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2020

December 28, 2020

Project location map

1635 Bonanza Dr, Park City, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.