BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Portland, Oregon. Completed plans call for the renovation of a educational facility.

Direct all questions regarding this ITB to: Brandon Niles Email: purchasing@pps.net Phone: 503-916-3031 DEADLINE FOR QUESTIONS OR CLARIFICATIONS December 4, 2020 This Contract is a Public Work subject to ORS 279C.800 to 279C.870. Remove all the copper in the indicated areas Place copper in containers provided by PPS for recycling Install new underlayment over existing wall furring as shown on site map Install new 24 Gauge prefinished vertical panel system as shown on site map The prefinished steel panels shall have 1 1/2 " rib with 90 degree vertical box on 9" center The copper flashing around the windows shall remain and be painted to match the new prefinished steel A 2-piece starter shall be used at roof to allow for future roof replacement Supply and install all associated trim flashing with panel system to complete a fully weather tight product. Remove any remaining copper louvers from existing curb mounted ventilation frames. Fabricate and install new 24 gauge prefinished louvers at all openings of curb mounted ventilation frame assemblies. Fasten new lovers to existing frames with #14 x 1 1/2 "stainless screws Remove the copper tops of the ventilation frame assemblies. And replace with 24 gauge prefinished steel Clad remaining parts of the ventilation assemblies with 24 gauge prefinished steel Remove the soffit in the indicated areas and replace with 24 gauge prefinished steel to match profile of existing soffit Remove and replace the parapet cap in the indicated areas with 24 gauge prefinished steel Remove the school sign and date save and reinstall Remove ladders and reinstall after the sidings has been replaced Remove and replace any electrical necessary to replace the copper. Contractor will provide temp fencing area and lock for the dumpster. Replace Damaged Louver as seen in the included photo. New prefinished steel Panels to match the color of the replacement panels on the building shown in the photos below.

Award

Educational

$250,195.00

Public - City

Renovation

3

8

4

4

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
27
Bidding Soon
574
All Active Projects
281
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2021

June 16, 2021

img_map_placeholder

Multiple Locations, Portland, OR

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.