Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, outdoor lighting and renovation of a mixed-use development in Fullerton, California. Completed plans call for site work for a playground / park / athletic field; for the renovation of a swimming pool; swimming pool; and for outdoor lighting for a playground / park / athletic field.
the entire work as described below: The Work shall consist of, but not limited to, removing existing site lighting poles, demolition of existing light pole foundations, construction of new light pole foundations, furnishing and installing new light poles and fixtures, installation of new electrical systems, concrete hardscape removal and replacement, and all related work. Due to COVID-19 directives, City Hall is currently closed to the public. However, staff members will be present outside of City Hall starting at 1:30 p.m. and will remain onsite until after the bid opening is completed. It is highly recommended to arrive with sufficient time for bidders to be able to line up. Bidders coming to City Hall are required to wear appropriate face coverings per the Citys Municipal Code and shall keep a minimum six (6) feet of separation while waiting in line to submit and during the bid opening process per the current social distancing guidelines. Bidders wanting to utilize delivery services (USPS, UPS, FedEx, etc.) or wanting to drop off bids outside the specified time window should make arrangements with City of Fullerton staff in advance. No Bid will be accepted unless it is made on a Bid Schedule form furnished by the Public Works Department, Engineering Division contained within the Specifications. The time of completion of contract shall be twenty (20) working days as defined in the Standard Specifications for Public Works, 2018 Edition. Liquidated Damages, as defined in the referenced specifications, Section 6-9, shall be $500 per calendar day.The Engineer's estimate for this project is $200,000. January 5, 2021 Award of Contract to Lowest Responsible Bidder,January 26, 2021 Deadline for Contractor to submit agreement, bonds, insurance documents, Water Pollution Control Documents, February 3, 2021 Preconstruction Meeting. The Contractor agrees to commence the work and related services upon the receipt of a written Notice to Proceed from the City. It is the Contractor's responsibility to provide sufficient and qualified personnel, equipment and materials. Each bid must be accompanied by a certified or cashier's check, or bidder's bond, made payable to the City of Fullerton, for an amount equal to at least 10% of the amount bid, such guarantee to be forfeited should the bidder to whom the contract is awarded fail to enter into the contract. In addition, a Performance Bond in the amount of 100% of the bid, and a Labor and Materials Bond in the amount of 100% of the bid shall be required of the successful bidder prior to entering into a contract. The City will permit substitution of approved securities for monies retained on this project in accordance with Section 7-3.2 of the Standard Specifications for Public Works Construction.For help accessing and ordering, please contact an ARC Planwell Administrator at 949.660.1150.
Award
Swimming Pools
$179,333.00
Public - City
Outdoor Lighting, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 9, 2020
February 8, 2021
801 W Valencia Dr, Fullerton, CA
Related To This Project
Fullerton, CA
Bid Date: Nov 18 2021
Fullerton, CA
Bid Date: Nov 18 2021
Fullerton, CA
Bid Date: Mar 02 2021
Fullerton, CA
Bid Date: Apr 01 2021
Fullerton, CA
Bid Date: Feb 09 2021
Fullerton, CA
Bid Date: May 29 2019
Fullerton, CA
Bid Date: Jul 29 2019
Fullerton, CA
Bid Date: Jun 26 2019
Fullerton, CA
Bid Date: Oct 14 2021
Fullerton, CA
Bid Date: Apr 21 2021
Fullerton, CA
Bid Date: Aug 22 2019
Fullerton, CA
Bid Date: Jul 14 2020
Fullerton, CA
Bid Date: Sep 15 2020
Fullerton, CA
Bid Date: Feb 21 2024
Fullerton, CA
Bid Date: Sep 26 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.