BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, new construction and renovation of a medical facility in Sacramento, California. Completed plans call for the renovation of a 85,000-square-foot medical facility; for the construction of a 900,000-square-foot, 14-story above grade, one-story below grade, 332-bed medical facility; and for site work for a medical facility.

As of December 17, 2021, design build documents are underway. The project is projected to start construction 2023 thought that timeline has not yet been confirmed. As of June 28, 2021, an awarded Design/Build Construction Manager has been identified. Release of RFQ/DB bid packages is underway. The proposed site is located on the east end of the existing hospital, adjacent to the Pavilion that houses primarily surgery, ICUs, the burn unit, and the emergency department. The new RHT, which will attach to the Pavilion, is envisioned to provide 332 inpatient beds (ICU, Medical/Surgical, Acuity Adaptable (i.e., ICU-capable), Airborne Infection Isolation, Protected Environment), complex procedure rooms, and imaging and other support services. The building will have 14 floors, including a basement, and a penthouse, a helipad, approximately 900,000 BGSF of new space, plus approximately 85,000 BGSF of renovation. Utilities for the RHT will be supplied from the Central Utilities Plant. PLEASE NOTE: This project is a Progressive Design-Build contract with a team that includes the Architect, Engineers of Record, General Contractor, and other subconsultants and subcontractors. Project Delivery Method: Progressive Design-Build Estimated Construction Cost Range: $2B Following is the University timeframe for the project. Assumptions include phased approvals, overlapping packages, incremental review and approval as detailed in the OSHPD CRC schedule (once issued). Phase 1: Program Validation, Site Master Planning, Schematic and Design Development Documents (Commence 7/1/2020) Phase 2: Construction Documents & Approvals (2021 through 2023) Phase 3: Construction (2024 through 2030) First Patient (2030)

Award

Medical

$975,000,000.00

Public - State/Provincial

New Construction, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
85
Bidding Soon
1,546
All Active Projects
573
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 10, 2020

January 16, 2023

img_map_placeholder

4800 2nd Ave, Sacramento, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.