BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Clearwater, Florida. Working plans call for site work for a water / sewer project.

As of August 9, 2024, an engineer and a construction manager has been selected. This project is in the pre-construction/negotiated status and design is 60% complete. A timeline for sub-bid opportunities have not been determined. It is anticipated construction will start in March 2025. 60-inch diameter pipeline from Tampa Bay Water’s regional system to the Lithia Water Treatment Plant *The closed solicitation has been included below for reference: Tampa Bay Water, A Regional Water Supply Authority, is soliciting a Request for Proposals (RFP) from qualified firms to provide Professional Engineering Services for the Southern Hillsborough County Supply Expansion Pipelines The purpose of this Request for Proposals (RFP) is to solicit responses from qualified firms or individuals to provide Professional engineering and supporting services for a large diameter pipeline design and construction project in accordance with Request for Proposals, Scope of Services and Project references attached. Bid Bond - Not Applicable M/WBE's are encouraged to participate in the bid process. Any inquiries, discrepancies or inconsistencies in the instructions to respondents or proposal requirements should be submitted via email to rkavanagh@tampabaywater.org and purchasing@tampabaywater.org with "Contracts 2021-024/025" in the subject line. Written inquiries for additional information or clarifications will be accepted in writing at the above email address until close of business on January 14, 2021. Tampa Bay Water will respond via addendum regarding any discrepancy, omission or inconsistency and provide answers to inquiries. Respondents shall review the attached draft contract that Tampa Bay Water will utilize to secure the services described herein in its entirety. As part of the submittal package, Respondents will provide a written statement accepting the terms and conditions of the contract "as is" with no modifications or provide comments or requests for modifications for Tampa Bay Water's consideration. Tampa Bay Water reserves the right to reject the respondent's comments. Time is of the essence; therefore, firms should be prepared to execute the contract in a timely manner upon selection in order to begin the work required within the time frame established. Respondent understands that Proposals are to remain open for an acceptance period of 120 (one hundred-twenty) days after the submittal due date for evaluation purposes. Tampa Bay Water reserves the right to reject all proposals. Scoring of Submittals and Initial Ranking 02/04/21 thru 03/03/21 Selection Committee Meeting - Short List 03/11/21, 9:00 - 10:00 a.m. (EST) Oral Presentations (If required) 03/25/21, 9:00 a.m.-2:00 p.m. (EDT) Notice of Intent Posting Short List 03/25/21 Shortlist Approval to Negotiate at Board of Directors Meeting 04/19/21 Final Contract Approvals at Board of Directors Meeting 08/16/21 The method of Contractor Selection has not been Determined at this time.

Pre-Construction/Negotiated

Water / Sewer

$265,600,000.00

Public - County

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
256
Active Projects
108
Bidding Soon
1,967
All Active Projects
764
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 3, 2025

img_map_placeholder

Multiple Locations, Clearwater, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.