Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 20, 2021 at 7:00 PM

Updated September 14, 2023

Site work and paving for a bridge / tunnel in Regina, Saskatchewan. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Construction of a Short Span Bridge on Highway No. 165 over Wuchewun River, C.S. 165-01 approximately 37.14 km northwest of junction with Highway No. 106, near Big Sandy Lake, Saskatchewan. Estimated Quantities: Design, Construction, Maintenance And Removal Of A Temporary Detour: Lump Sum Foundation Excavation: Lump Sum 324 mm Piling: 240 m Granular Backfill At Bridges: 443 m3 Mobilization: Lump Sum Mobilization For Pile Driving: Lump Sum

Award

Bridges / Tunnels

$712,978.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

70 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
20
Bidding Soon
223
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2021

July 1, 2021

Project location map

Multiple Locations, Regina, SK

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed