Site work and paving for a civil project in River Forest, Illinois. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.
Roadway reconstruction, box culvert replacement, and construction of a soldier pile retaining wall under the I-294 bridge, on Franklin Avenue from east of the Canadian Pacific Bensenville Yard entrance to est of the I-294 bridge in Franklin Park. Region: 1 District: 1 VBP %: 0.00 Federal Project # : I2I8(290) County(s): Cook Key Route(s): FAU 3533 Marked Route(s): Franklin Avenue Section(s): 17-00083-01-BR (Franklin Park) State Job #(s): C-91-384-20 PPS #(s): 1-22088-0010 Completion Date: August 20, 2021 Plus 5 Working Days. Questions not accepted as of January 05, 2021 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. Contractors planning to submit a bid MUST request authorization to bid. Requests for authorization to bid must be received prior to 4:30 PM prevailing local time, January 12, 2021 , at the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764. The department or the Chief Procurement Officer (CPO) for the Illinois Department of Transportation reserve the right to postpone the bid opening in the event of circumstances beyond the reasonable control of the department, such as but not limited to a cataclysmic event or extraordinary conditions of weather. If the department or CPO postpones the bid opening, the department will take all reasonable steps to notify potential bidders. IDOT - 121 - Roadway Reconstruction, Box Culvert Replacement, and Constructon of a Soldier Pile Retaining Wall Under the I-294 Bridge, on Franklin Avenue The work to be performed under this contract includes roadway reconstruction with HMA pavement, guardrail removal and installation, proposed storm sewer, removal and reconstruction of Silver Creek Box Culvert, and proposed soldier pile retaining wall under I-294 Bridge over Franklin Avenue, pavement markings and all incidental and collateral work necessary to complete the project as shown on the plans and as described herein The Contractor will be allowed to complete all clean-up work and punch list items within 5 working days after the completion date for opening the roadway to traffic. Under extenuating circumstances, the Engineer may direct that certain items of work, not affecting the safe opening of the roadway to traffic, may be completed within the working days allowed for clean up work and punch list items. Temporary lane closures for this work may be allowed at the discretion of the Engineer.
Award
Roads / Highways
$1,671,760.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 15, 2021
March 16, 2021
Franklin Ave, River Forest, IL
Related To This Project
River Forest, IL
Bid Date: Apr 12 2021
River Forest, IL
Bid Date: Mar 27 2020
River Forest, IL
Bid Date: Jan 12 2022
River Forest, IL
--
River Forest, IL
Bid Date: Feb 11 2022
River Forest, IL
Bid Date: May 09 2019
River Forest, IL
Bid Date: Jan 12 2022
River Forest, IL
Bid Date: Oct 10 2023
River Forest, IL
Bid Date: Jul 21 2023
River Forest, IL
Bid Date: Jun 09 2023
River Forest, IL
Bid Date: Apr 28 2023
River Forest, IL
Bid Date: Mar 13 2023
River Forest, IL
Bid Date: Mar 13 2023
River Forest, IL
Bid Date: Mar 28 2023
River Forest, IL
Bid Date: Mar 03 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.