Site work and paving for a mixed-use development in Tigard, Oregon. Completed plans call for site work for a road / highway; and sidewalk / parking lot.

The project name is: SW 121st Avenue Improvements Tippitt Pl. to Whistler's Lp. The work to be done under this contract consists of the following in Washington County: o Construct roadway widening including curbs, curbs and gutters, curb ramps, bike lanes, driveways, and sidewalks. o Construct new water lines, water meters, and structures o Construct storm conveyance system and storm water treatment facilities. o Construct retaining walls. o Install Rectangular Rapid Flashing Beacon (RRFBs), and illumination. o Install conduits and junction boxes for future signal interconnect. o Install new signing and striping. o Install/Extend sanitary sewer laterals. o Reconstruct/Overlay pavement (121st Avenue and Fonner Road) o Perform additional and Incidental Work as called for by the Specifications and Plans. The Project cost range is $5,000,000 - $8,000,000 A residency statement as defined in ORS 279C.365. o A bid bond on the County's Bid Guaranty form, irrevocable letter of credit issued by an insured institution as defined in ORS 706.008, certified check, or cashier's check, of at least ten percent (10%) of the total bid. Bids may be rejected by the County for non-compliance with prescribed public bidding procedures and requirements, and for good cause, upon a finding that it is in the public interest to do so BIDDERS: Bidders are solely responsible for ensuring actual receipt of the bid by Washington County DLUT. Bidders must be prequalified by the Oregon Department of Transportation and licensed by the Oregon Construction Contractor's Board pursuant to ORS 701.026 prior to submitting a bid. Bidders must use bid and bid guaranty forms (if electing to use a bid bond) furnished by the county in these bid documents. Otherwise, the bid may be rejected as non-responsive. Bidders must conform to the requirements of these bid documents and related, applicable laws. Bidders shall be solely responsible to check for and download all addenda, if any, from the OpenGov Procurement website prior to bidding. Bidders must sign all Bid Forms, and in doing so agree to comply with the statement in the Bid Form regarding compliance with the provisions of ORS 279C.840 or 40 U.S.C. 276a "Workers on Public Works to be Paid Not Less Than Prevailing Rate of Wage". Bidders must complete and submit the First-tier Subcontractors Disclosure Form provided, either with the bid, or using a separate, linked solicitation on the OpenGov Procurement site. This form shall be submitted no later than two work hours after the time bids are due, per 00120.40(f). First Tier Subcontractors Disclosure forms submitted via email will not be accepted. Licensing per ORS 468A.720 (working with asbestos) is not required for this project. THE COUNTY: The County reserves the right to waive any irregularities or informalities. Plan Holder's List and Bid Results: Information regarding plan holder lists and bid results will only be available on the OpenGov Procurement website. Questions: Submit questions only in writing on the County's OpenGov Procurement Portal with the Question/Answer feature on the project page. Replies to these questions will be posted on the County portal as well. PROJECT STAFF WILL ONLY RESPOND TO QUESTIONS SUBMITTED IN WRITING Project Contacts: Patrick Oakes, Project Manager 1400 SW Walnut St, MS #18 Hillsboro, OR 97123-5625 Phone: 503-846-7826 Fax: 503-846-7810 Kira Furby, Engineering Associate 1400 SW Walnut St, MS #18 Hillsboro, OR 97123-5625 Phone: 503-846-7816 Fax: 503-846-7810 Scope - This Work consists of all surveying activities necessary tocontrolthemany phases of Work required toconstructthe Project to the lines and grades asshown,specified, or established. The Work includes surveying activitiesfor the following: o Retaining walls o Earthwork o Bases o Drainage andutilities o Paving and surfacings o Traffic signals(RRFBs) o Signing and Striping

Award

Roads / Highways

$6,583,000.00

Public - County

Paving, Site Work

208

25

4

5

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Spare Parts
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Openings, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Facility Storm Drainage, Sump Pumps
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Backfill, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
33
Bidding Soon
615
All Active Projects
218
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2022

June 3, 2022

img_map_placeholder

SW 121st Ave, Tigard, OR


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.