Demolition, site work and new construction of a civil project in Melbourne, Florida. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

**As of 2/22/2021 project was not yet been awarded. No estimated time frame yet. The proposed project consists of Phase 1 improvements to the West Cocoa Wastewater Collection, Pumping and Transmission System which includes Lift Station W-09, Lift Station W-22 and the gravity sewer subsystems within Lift Station W-09 service area. A brief summary of the project is presented below: The existing Lift Station W-09 will be demolished and replaced with a new submersible lift station with a 12-foot diameter wet well constructed adjacent to the existing lift station. A short length of new force main will be constructed for Lift Station W-09 and shall connect to the existing 14 force main. The new lift station will include but not be limited to a submersible lift station with 12-foot diameter pre-cast concrete wet well; triplex submersible pumps; piping, valves, fittings and magnetic flowmeter; electrical system with control panel; telemetry system and instrumentation; and an emergency diesel pump. The existing force main from Lift Station W-09 shall pump wastewater generated in the collection area of all lift stations in the West Cocoa wastewater system and will convey this wastewater to the South-Central Wastewater Treatment Plant (SCWWTF) through a series of manifolded force mains. The existing Lift Station W-22 will be rehabilitated by replacing all pumping, piping, mechanical and electrical components including SCADA and other instrumentation. Lift Station W-22 force main manifolds with the force main from Lift Station W-09 and pumps wastewater to the SCWWTF. The project shall include site work and site restoration after construction and erosion control during construction, pumping, piping, mechanical and electrical components, SCADA and other instrumentation and all other incidentals necessary to complete the work in accordance with the Contract Documents. Insurance Required Yes Bid Bond Required Yes Bid Bond Amount 5% complete the Work no later than 270 days after the date specified in the Notice to Proceed

Award

Water / Sewer

$2,483,700.00

Public - County

Demolition, New Construction, Site Work

Subscribe For Documents

66 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
46
Bidding Soon
945
All Active Projects
412
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 22, 2021

February 22, 2021

img_map_placeholder

10001 N Wickham Rd, Melbourne, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.