Published February 25, 2021 at 7:00 PM
Updated May 7, 2025
Demolition, site work and new construction of a civil project in Melbourne, Florida. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.
**As of 2/22/2021 project was not yet been awarded. No estimated time frame yet. The proposed project consists of Phase 1 improvements to the West Cocoa Wastewater Collection, Pumping and Transmission System which includes Lift Station W-09, Lift Station W-22 and the gravity sewer subsystems within Lift Station W-09 service area. A brief summary of the project is presented below: The existing Lift Station W-09 will be demolished and replaced with a new submersible lift station with a 12-foot diameter wet well constructed adjacent to the existing lift station. A short length of new force main will be constructed for Lift Station W-09 and shall connect to the existing 14 force main. The new lift station will include but not be limited to a submersible lift station with 12-foot diameter pre-cast concrete wet well; triplex submersible pumps; piping, valves, fittings and magnetic flowmeter; electrical system with control panel; telemetry system and instrumentation; and an emergency diesel pump. The existing force main from Lift Station W-09 shall pump wastewater generated in the collection area of all lift stations in the West Cocoa wastewater system and will convey this wastewater to the South-Central Wastewater Treatment Plant (SCWWTF) through a series of manifolded force mains. The existing Lift Station W-22 will be rehabilitated by replacing all pumping, piping, mechanical and electrical components including SCADA and other instrumentation. Lift Station W-22 force main manifolds with the force main from Lift Station W-09 and pumps wastewater to the SCWWTF. The project shall include site work and site restoration after construction and erosion control during construction, pumping, piping, mechanical and electrical components, SCADA and other instrumentation and all other incidentals necessary to complete the work in accordance with the Contract Documents. Insurance Required Yes Bid Bond Required Yes Bid Bond Amount 5% complete the Work no later than 270 days after the date specified in the Notice to Proceed
Award
Water / Sewer
$2,483,700.00
Public - County
Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 22, 2021
February 22, 2021

10001 N Wickham Rd, Melbourne, FL
Related To This Project
Melbourne, FL
Bid Date: Sep 23 2022
Melbourne, FL
Bid Date: Sep 15 2022
Melbourne, FL
Bid Date: Nov 02 2021
Melbourne, FL
Bid Date: Nov 12 2019
Melbourne, FL
Bid Date: May 15 2015
Melbourne, FL
Bid Date: Jan 25 2023
Melbourne, FL
Bid Date: Jan 24 2023
Melbourne, FL
Bid Date: Feb 03 2023
Melbourne, FL
Bid Date: May 20 2021
Melbourne, FL
Bid Date: Jul 29 2022
Melbourne, FL
Bid Date: Oct 04 2019
Melbourne, FL
Bid Date: Jul 29 2022
Melbourne, FL
Bid Date: Aug 25 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Find. Bid. Win. Your Next Project Starts Here.
ConstructConnect gives you the tools to search, analyze, and bid on verified commercial projects before your competition. Explore detailed project data, bidding timelines, and contact info—right when you need it.
Sign up now to get free company and project data instantly. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.