BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 3, 2025 at 8:00 PM

Updated May 4, 2025

Site work and paving for a road / highway in League City, Texas. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

UPDATE This project evolved during a FY2021 Council Budget Work Session of how to best utilize additional funds from the Operating Budget into CIP. It was determined to use these funds to design an Extension of Hobbs Road 3,000 LF as a 4-lane curb and gutter street from its current southerly most end to FM 517. The design would include two phases; an option phase where Staff would select the most desirable route; Phase 2 would be the remaining design work from the option selected during phase 1. FY2024 would include 100ft ROW purchase for new 4-lane minor arterial street. Construction of the initial 2-lanes would include drainage improvements, and intersection improvements at the Hobbs Road and FM 517 intersection. The construction budget for 2-lanes is an estimate based on direct alignment and will be updated once the scope is defined during the design process. The remaining 2-lanes for a 4-lane roadway will be a future project. The project estimate does not include the realignment of Cemetery Road which is required for TxDOT approval. This project is currently on HOLD as there is no consensus with Dickinson on the realignment of Cemetery Road. Project is in City of League City capital budget fy 2025-2029 CIP _____________________________________________________________________________________ This project is included in the city's fy 2024-2028 Capital Improvement Program. As of July 5, 2024, further details regarding construction and completion timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$5,900,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
4
Bidding Soon
1,894
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2027

Project location map

Hobbs Rd, League City, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.