Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published December 7, 2021 at 7:00 PM
Updated June 21, 2025
Site work and new construction of a municipal facility in Vlg Wellingtn, Florida. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.
All submittals must be delivered in sealed envelopes and plainly marked: Attention: Clerks Office, RFQ #202107 - Construction Manager at Risk for Town Center Phase II RFQ documents may be downloaded at electronically starting on January 3, 2021. Evaluation/Short-list Committee Review will be held on February 18, 2021 at 10:00 A.M. Local Time in Village of Wellingtons City Hall, 12300 Forest Hill Boulevard, Wellington, Fl. 33414. Presentations and oral interviews will be conducted on March 4, 2021 beginning at 9:00 A.M. Local Time. Construction Manager selection will be announced after the oral interviews take place. Wellington reserves the right to accept or reject any or all RFQ submittals (in whole or in part) with or without cause, to waive technicalities, irregularities or informalities, or to accept RFQ submittals which in its judgment best serves the interests of Wellington. Any and all questions regarding this solicitation shall be directed to the Wellington Purchasing Division: Attn: Danielle Zembrzuski, 12300 Forest Hill Boulevard, Wellington, Florida 33414: Ph 561-791-4107 or email: dzembrzuski@wellingtonfl.gov the expansion of the existing Amphitheater, relocation and expansion of Scott's Place, a barrier free playground, the removal and replacement of parking areas, the creation of an open green space, relocation of mature Royal Palms/Oaks and other trees removal and replacement of the existing restroom building with the "Gateway" building. Additional improvements may include Northside Park and Sunset Plaza, along with other site improvements to Town Center. In total, this project is hereafter identified as "Town Center Phase II". The key components to Town Center Phase II are as noted above, with all proposed improvements located within the limits of the Town Center. Wellington and the design team are looking to forge a close working relationship with a qualified firm for the pre-construction services and construction of the Town Center Phase II project. The Village has engaged the services of design professionals in developing the Town Center Phase II Construction Plans. These same professionals will be available during the construction process. The proposer shall highlight the firm's experience in coordinating design activities related to projects like Town Center Phase II. In addition, the interested proposer should highlight any Construction Manager at Risk experience in developing outdoor amphitheaters, barrier free playgrounds, open green spaces, as well as sound booths and public restroom facilities, similar to those being proposed for Town Center Phase II.
Award
Municipal
$8,000,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 3, 2021
December 1, 2021
Multiple Locations, Vlg Wellingtn, FL
Related To This Project
Vlg Wellingtn, FL
Bid Date: Feb 20 2024
Vlg Wellingtn, FL
Bid Date: Feb 27 2019
Vlg Wellingtn, FL
--
Miami Lakes, FL
Bid Date: Oct 21 2021
Pompano Beach, FL
Bid Date: Feb 09 2021
North Miami, FL
Bid Date: Mar 09 2021
Lake Worth, FL
Bid Date: Mar 16 2021
Brooksville, FL
Bid Date: Nov 18 2024
Southwest Ranches, FL
Bid Date: Nov 08 2024
Port St Lucie, FL
Bid Date: Oct 30 2024
Jacksonville, FL
Bid Date: Nov 14 2024
Perry, FL
Bid Date: Jan 13 2025
Spring Hill, FL
Bid Date: Nov 18 2024
Coral Gables, FL
--
Boynton Beach, FL
Bid Date: Nov 07 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed
