Published October 3, 2023 at 8:00 PM

Updated January 27, 2024

Site work, paving and new construction of a mixed-use development in Racine, Wisconsin. Completed plans call for paving for a road / highway; for site work for a road / highway; for the construction of a pre-engineered storage facility; pre-engineered storage facility; sidewalk / parking lot; and sidewalk / parking lot.

In general, the work consists of: construction of an unheated pre-engineered metal building at the Racine Readiness Center. Main work items include earth excavation, sewer and water construction, concrete pavement and sidewalk, structural concrete foundations and reinforced concrete slab on grade, electrical panel and circuit installation, lighting, and interior fencing/partitions. The MEP Subcontractor scope of work is identical to the General Prime Contractor 40 scope of work included in these bidding and contract documents. By submitting and signing a bid, 41 all bidders have examined all of the Bidding Documents listed in the Table of Contents of the project 42 specifications. The successful bidders will be required to do all work which is shown on the 43 drawings, mentioned in the specifications, or reasonably implied as necessary to complete the 44 division of work bid for this project.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$824,182.00

Public - State/Provincial

New Construction, Paving, Site Work

19

29

2

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels, Metal Wall Panels
Division 08 - Openings

Division 08 - Openings

Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceilings, Wall Finishes
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Parking Key and Card Control Units, Foodservice Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Multiple Seating, Pews and Benches, Benches
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, HVAC Fans
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting, Interior Lighting, Interior Lighting Fixtures, Lamps, And Ballasts
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Shotcrete Soil Slope Stabilization, Shoring and Underpinning
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Bases, Ballasts, and Paving, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Culverts
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
95
Bidding Soon
2,020
All Active Projects
759
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 17, 2023

September 18, 2023

img_map_placeholder

700 24th St, Racine, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.