Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 2, 2021 at 7:00 PM
Updated January 26, 2024
Demolition, site work and addition to a municipal facility in Hooper, Utah. Completed plans call for the addition of a municipal facility; for the demolition of a municipal facility; and for site work for a municipal facility.
Construction Cost Estimate: $550,000 The work covered by this section includes furnishing all labor and materials and performing all operations in connection with the application of a clear, penetrating water repellent to the following exposed vertical surfaces. 1. Furnish all labor, materials, and equipment necessary for the completion of the mechanical and plumbing scope of work. 2. Furnish and install all motors specified in this Division and be responsible for the proper operation of electrical powered equipment furnished by this Division. 3. Furnish exact location of electrical connections and information on motor controls to Division 26. 4. Mechanical Contractor shall obtain the services of independent Test and Balance Agency. 5. Placing the air conditioning, heating, ventilating, and exhaust systems into full operation and continuing their operation during each working day of testing and balancing. 6. Making changes in pulleys, belts, and dampers, or adding dampers, as required for the correct balance as recommended by Balancing Contractor at no additional cost to Owner. 7. Air balance, final adjustment and test run. 8. The satisfactory performance of the completed systems is a requirement of this specification.
Award
Municipal
$665,000.00
Public - State/Provincial
Addition, Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 28, 2021
March 1, 2021
4786 S 7500 W, Hooper, UT
Related To This Project
Hooper, UT
Bid Date: Feb 16 2023
Hooper, UT
--
Hooper, UT
Bid Date: Dec 19 2019
Hooper, UT
Bid Date: Jul 06 2021
Hooper, UT
Bid Date: May 20 2024
Hooper, UT
Bid Date: Apr 06 2023
Hooper, UT
Bid Date: Feb 21 2023
Hooper, UT
--
Hooper, UT
Bid Date: Dec 21 2022
Hooper, UT
Bid Date: Nov 22 2022
Hooper, UT
Bid Date: Nov 22 2022
Salt Lake City, UT
Bid Date: May 25 2021
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
