BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 10, 2021 at 7:00 PM

Updated January 26, 2024

Site work, paving and new construction of a bridge / tunnel in Olivia, Minnesota. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Construct Bridge 65570 (Concrete Slab Span) and approach grading Approximate major items of work are: 588 Ton Aggregate Surfacing Class-5, 165 LY Type S (TL-4) Barrier Concrete, 29,840 Lbs Reinforcement Bars (Epoxy Coated), 2,868 SF Bridge Slab Concrete (3HYPC-M), 321 LF Precast Concrete Beams 36M,320 LF C.I.P. Conc. Piling 12",580 Ton Random Riprap Class III Construction Start Date:04/01/2021, Construction End Date:07/30/2021, Construction Location:130th St., Over Chetamba Crk, 9/10-116-38, 8.5 mi. NW of Sacred Heart, MN

Award

Bridges / Tunnels

$368,640.00

Public - County

New Construction, Paving, Site Work

52

6

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
29
Bidding Soon
486
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2021

March 5, 2021

Project location map

To Be Determined, Olivia, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.