BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Burton, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Work under this Contract consists of the open cut replacement of approximately 695 feet of 8-inch sanitary sewer and 284 feet of 10-inch sanitary sewer, the lining of approximately 26,382-feet of 8-inch to 15-inch sanitary sewer with cured-in-place pipe, the installation of 10 sectional cured-in-place pipe repair liners and associated sanitary manhole rehabilitation. This project will be funded by a Clean Water State Revolving Fund Loan (CWSRF), all applicable rules and requirements will apply. Any questions regarding the project shall be brought to the attention of Mr. Chris Elenbaas, PE at Stantec Consulting Michigan Inc., in writing by email at christopher.elenbaas@stantec.com or by fax at (734) 761-1200. Questions by telephone call are prohibited. Questions will not be accepted if received less than nine (9) calendar days before the bids are due. All bids shall be submitted in a sealed envelope and shall contain, as a minimum, all of the following: Bidders Qualification and Experience Statement (QES-1-4), Proposal (P1-5), Designation of Major Subcontractors and Suppliers (MS-1), Legal Status of Bidder (LS-1), Bid Certification (BC-1). BID SECURITY: Each Proposal shall be accompanied by a cashier's check, certified check, money order or bid bond, payable to the OWNER, in an amount not less than five percent (5%) of the amount of the Proposal, as a Bid Security. The Bid Security of the Bidders under consideration will be returned after approval of the Contract by the OWNER. All others will be returned after the Proposal opening. CONTRACT SECURITY: The successful Bidder will be required to furnish a satisfactory Performance Bond and Labor and Material Bond, each in the amount of One Hundred Percent (100%) of the Contract. PROPOSAL WITHDRAWAL: Withdrawal of any Proposal is prohibited for a period of 90 days after the actual date of the opening thereof. OWNER'S RIGHTS: The OWNER reserves the right to accept any Proposal, to reject any or all Proposals, and to waive any irregularities in any Proposal, in the interest of the OWNER. NON-DISCRIMINATION: Bidders shall not discriminate against any employees or firm due to origin, race, age, or physical conditions. CONTRACTOR shall be an equal opportunity employer. ADDITIONAL REQUIREMENTS: The following requirements shall apply to the Contract for the work of this project and to all subcontracts thereunder: 1) State of Michigan Revolving Fund Requirements; 2) Disadvantaged Business Enterprises (DBE) Specifications and Forms; 3) Project Wage Determination (under the Davis-Bacon Act, as amended, and related statutes); 4) Equal Opportunity Clause (Executive Order 11246); 5) Debarment Certification. The successful bidder shall fully comply with all of these special provisions and shall be responsible to ensure compliance with same by all of his subcontractors. Bids not incompliance with the contract requirement will risk forfeit of bid security bond.

Award

Water / Sewer

$1,748,202.00

Public - City

Paving, Site Work

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
75
Bidding Soon
1,349
All Active Projects
554
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2021

April 12, 2021

img_map_placeholder

Multiple Locations, Burton, MI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.