Published March 19, 2021 at 8:00 PM

Updated January 26, 2024

Site work and renovation of a civil project in Mellette, South Dakota. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Bids are invited upon the items and approximate quantities of work as follows: Base Bid 1. Approximately 3,000 Feet of 6” PVC Forcemain Piping 2. Approximately 1 Each Sanitary Sewer Manhole 3. Approximately 1 Each Sanitary Sewer Pond Inlet Structure 4. Approximately 250 Feet of Highway and Railroad Boring 5. Approximately 1 L.S. Lift Station Dry Well Modification 6. Approximately 1 L.S. New Lift Station Controls and VFD’s 7. Approximately 1 L.S. Sewer By-Pass Pumping 8. Approximately 800 Tons of Gravel Street Repair 9. Other misc. construction related items Additionally, upon request, in accordance with South Dakota Codified Law 5-18B1, one copy of Plans and Specifications shall be furnished, without charge, to each Contractor resident in South Dakota who intends, in good faith, to bid upon the project. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the Bidder’s date of receipt of the Bidding Documents. Partial sets of the Bidding Documents will not be available from the Issuing Office. No pre-bid conference will be held. COVID-19 Precautions Mellette will not restrict access to this project’s bid opening; however, they do respectfully ask that only one representative per bidder be present for the public opening and reading of the bids in an effort to follow the recommendations of the Governor of South Dakota and the guidelines to prevent the spread of COVID-19. In addition, Mellette shall enforce the “social distancing” rule and, therefore, anyone attending the meeting will be required to comply with said rule. Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment requirements: The low responsive bidder must assure compliance with the requirements of Public Law 115-232, Section 889, Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment. Bid security shall be furnished in accordance with the Instructions to Bidders. Bidders on this work will be required to comply with the Presidents Executive Order Nos. 11246 as amended, 11518, and 11625 as amended. The requirements for bidders and contractors under these orders are explained in the specifications. The low responsive bidder will be required to certify to compliance with the American Iron and Steel provision of the Consolidated Appropriations Act of 2014. This certification form may be found on page AIS-21 of the State Revolving Fund (SRF) General Conditions and must be included in the bid proposal. Please be advised that waivers or exemptions from the American Iron and Steel provision that cite International Trade Agreements DO NOT comply with the Consolidated Appropriations Act of 2014 as it applies to the SRF programs. Claims from suppliers that the American Iron and Steel provision does not apply to certain products based on the International Trade Agreement exemptions of the Consolidated Appropriations Act of 2014 will not be accepted. Bidders on this work will be required to comply with Title 40 CFR 33 and Executive Order 12138. The requirements for bidders and contractors under this regulation which concerns utilization of Disadvantaged/Minority Business Enterprises (DBE/MBE) and Women’s Business Enterprises (WBE) are explained in the specifications. The goals for DBE/MBE participation are 1% and WBE participation are 4%. Bidders are also reminded that not less than the minimum wages as determined by the Davis Bacon Act and set forth in the Contract Documents must be paid on this project and that the contractor and/or subcontractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, or national origin. In addition to all of the above listed Federal requirements for work on this project, compliance with the contract Work Hours and Safety Standards Act, Executive Order 11375, Copeland Act, the Clean Air Act, and Water Pollution Control Act, and subsequent amendments to all of the above will be required of contractors and/or subcontractors performing work on this project.

Award

Water / Sewer

$299,945.00

Public - City

Renovation, Site Work

21

1

4

6

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Survey and Layout Data, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Temporary Water, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Temporary Roads, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Wall and Door Protection
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Laboratory Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners, Furniture, Seating, Chairs
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Storm Drainage
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Hoists, Lifting Devices, Clamps, Hooks, Slings
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
2
Bidding Soon
56
All Active Projects
26
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 26, 2021

April 15, 2021

img_map_placeholder

To Be Determined, Mellette, SD

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.