BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 20, 2021 at 7:00 PM

Updated November 15, 2023

Site work for a water / sewer project in Tulsa, Oklahoma. Completed plans call for site work for a water tank for rehabilitation.

OWRB LOAN NO. FAP-14-0004-L; ORF-19-0001-CW Contract requirements shall include compliance as required by law pertaining to the practice of non- discrimination in employment. "Equal Opportunity in Employment: All qualified applicants will receive considerations for employment without regard to race, color, religion, sex, national origin, age or physical handicap. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended." "Each bidder must fully comply with the requirements, terms and conditions of the Environmental Protection Agency's Small, Minority, Women's Businesses Requirements including employing the six (6) affirmative steps and soliciting small, minority and women's businesses during the performance of this contract. The bidder commits itself to following the affirmative steps to solicit small, minority and women's businesses contained herein and all other requirements, terms and conditions of these bid conditions by submitting a properly signed bid. Requirements are contained in: (1) Oklahoma Water Resources Board Guidance and Procedures, ORF-267." Davis Bacon Act wage rules shall apply. All laborers and mechanics employed by contractors and sub contractors on projects funded directly by or assisted in whole or in part by and through the Federal Government shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the secretary of Labor in accordance with subchapter IV of Chapter 31 of Title 40, United States Code and 29 CFR parts 1,3, and 5. The Department of Labor provides all pertinent information related to compliance with labor standards, including prevailing wage rates and instructions for reporting. Equal Opportunity in Employment All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, age or physical handicap. Bidders on this work will be required to comply with the President's executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in the specifications. Attention is called to Resolution No. 18145 of August 23, 1988, requiring bidders to commit to the goal of employing on the project at least fifty percent bona fide residents of the City of Tulsa and/or MSA in each employment classification. A Certified or Cashier's Check or Bidders Surety Bond, in the sum of 5% of the amount of the bid will be required from each bidder to be retained as liquidated damages in the event the successful bidder fails, neglects or refuses to enter into said contract for the construction of said public improvements for said project and furnish the necessary bonds within thirty days from and after the date the award is made. The bidder to whom a contract is awarded will be required to furnish public liability and workmen's compensation insurance; Performance, Statutory, and Maintenance bonds acceptable to the Tulsa Metropolitan Utility Authority, in conformity with the requirements of the proposed contract documents. The Performance, statutory, and Maintenance bonds shall be for one hundred percent (100%) of the contract price. MBE : 11.25% WBE : 7.41

Bid Results

Water / Sewer

$956,095.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
102
Bidding Soon
1,097
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2021

March 22, 2021

Project location map

E 71st St, Tulsa, OK


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.