BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Oak Park, Illinois. Completed plans call for the renovation of a educational facility.

**As of 03/10/2021, this project has not been awarded yet. A timeline for award has not yet been established. Board of Education, Oak Park Elementary School District 97, Oak Park, Cook County, Illinois, is seeking bids for Boiler Replacement work at Lincoln Elementary School located in 1111 S. Grove Ave., Oak Park, Illinois Bidders must comply with all of the requirements set forth in the Project Manual. The front of the envelope should be clearly marked "Lincoln Elementary School Boiler Replacement". Bid security, in the form of a bid bond or certified check, in an amount equal to ten percent (10%) of the base bid shall be submitted with the bid. Performance and Labor and Material Payment Bonds and Certificate of Insurance,as required by the Owner, will be required from the successful bidder. The Board of Education, Oak Park Elementary School District 97 reserves the right to waive any informalities, qualification or irregularities and/or reject any or all bids, when in its opinion, such action will serve the best interest of the Board of Education of Oak Park Elementary School District 97. All bidders must comply with applicable Illinois Law requiring the payment of prevailing rate of wage to all laborers, workmen and mechanics working on public funded projects. If during the time period of work, these rate changes, the contractor shall be responsible for additional costs without any change to the contract amount. The proposed contract is subject to the requirements of the Equal Employment Practices Commission and the Illinois Human Rights Act (HRA) Illinois Revised Statutes, Ch. 68, Par. 1-101, et. seg."(Including the requirement thatevery party to a public contract shall have adopted written sexual harassment policies, P.A. 87-1257). a. Selective demolitions b. General construction c. Roofing restoration d. HVAC, Plumbing and Electrical work work on-site shall be on or after June 11, 2021. Substantial Completion- September 15, 2021. Final Completion - October 1, 2021.

Bid Results

Educational

$497,794.00

Public - City

Renovation

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
89
Bidding Soon
1,791
All Active Projects
779
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2021

June 11, 2021

img_map_placeholder

1111 S Grove Ave, Oak Park, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.