Renovation of a municipal facility in Rochester, Minnesota. Completed plans call for the renovation of a municipal facility.

This project is to install the new boiler feedwater pump (BFP) in place of the existing BFP 2 located at the Olmsted Waste to Energy Facility (OWEF) in Rochester, Minnesota. Question Cutoff Date 2/9/2021 11:00:00 AM This work shall be performed between March 8th, 2021 and March 31, 2021. The project scope and submission requirements will be reviewed and Respondents will have the opportunity to address any questions regarding the specifications for this project. Respondents should come prepared with steel toe shoes, safety glasses, hearing protection and hard hats This project is to install the new boiler feedwater pump (BFP) in place of the existing BFP 2 located at the Olmsted Waste to Energy Facility (OWEF) in Rochester, Minnesota The OWEF is a waste-fired cogeneration power plant located in Rochester, Minnesota that is owned and operated by Olmsted County. The OWEF provides heating, cooling, electric power, and other utility services to a number of local buildings. The primary fuel for the OWEF is Municipal Solid Waste (MSW), with natural gas and light fuel oil serving as backup fuels The OWEF consists of two (2) 100 ton-per-day and one (1) 200 ton-per-day MSW combustor boiler units of the mass-burn water-cooled wall design, three (3) steam turbine-generators, MSW receiving facility, ash handling systems, air pollution control equipment, necessary auxiliary installations, medium voltage equipment necessary to connect with the utility grid, and a natural gas fired backup boiler. The two (2) 100 ton-per-day Riley/ Takuma waste combustor boiler units, Unit 1 and Unit 2, were commissioned in 1987. Unit 1 and Unit 2 are of the stoker fired, watercooled wall, excess air type. Unit 1 and Unit 2 supply about 25-30 kpph of live steam each, at 610 psig, 610-650 F. The one (1) 200 ton-per-day AEEVR/ Duro Dakovich waste combustor boiler unit, Unit 3, was commissioned in 2010. Unit 3 is a stoker fired, water-cooled wall, excess air type. Unit 3 supplies 57-63 kpph of live steam, at 610 psig, 610-650 F. The 75 kpph dual fuel Nebraska packaged boiler unit provides backup steam at 250 psig saturated conditions for use during the waste combustor boiler shutdowns Electrical power is generated with one (1) backpressure steam turbine generator unit of 1.86-MW nominal capacity (TG1), one (1) condensing steam turbine generator unit of 2.22-MW nominal capacity (TG2), and one (1) condensing/ extraction steam turbine generator unit of 5.4-MW nominal capacity (TG3). TG1 and/ or TG3 supply steam to a 60 psig header used primarily for the OWEF district energy system; TG2 exhausts into air cooled condenser 1; and TG3 exhausts into air cooled condenser 2. Steam from the 600 psig header is also cascaded to supply 250 psig steam headers through pressure reducing and de-superheating stations The facility operates continuously twenty-four (24) hours per day, seven (7) days per week, fifty-two (52) weeks every year. The planned operating schedule of each boiler allows for normal planned maintenance to be accomplished without interrupting the supply of steam or electricity. There are currently three (3) scheduled maintenance shutdowns per year for Unit 1 and Unit 2 each and two (2) scheduled maintenance shutdowns per year for Unit 3. Outage durations vary depending on the time of year, but normally requires about two (2) weeks for Unit 1 or Unit 2 and four (4) weeks for Unit 3. Outages typically do not occur simultaneously This project shall have all work specified below performed as a turnkey service, unless indicated otherwise in this specification. The contractor shall supply all supervision, labor, and tools for all work conducted onsite

Award

Municipal

$74,780.00

Public - County

Renovation

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
64
Bidding Soon
1,581
All Active Projects
515
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 19, 2021

March 8, 2021

March 31, 2021

img_map_placeholder

301 Energy Parkway NE, Rochester, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.