Published March 3, 2021 at 7:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Worcester, Massachusetts. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Contractor Qualification Highway Division PROJECT DESCRIPTION A. Work covered by Contract Documents: The Project is to transform a previously developed parking lot into a public plaza. Located on the newly planned Canal Street in Worcester's downtown area, the proposed open space is approximately one half-acre in size. It is intended to not only provide a significant pedestrian corridor between Green Street and Polar Park, Worcester's new AAA baseball stadium currently under construction, but also to be a unique public open space destination. The plaza will serve the City's residents and students, the Green Street neighborhood, and ballpark visitors. 1. Project Address: Canal Street. Worcester, MA. 2. Work included beyond the Contract Limits: Protection of abutting sidewalks and roadways in public way, and on adjacent properties. 3. Completeness: The Work shall be as shown on the Drawings and be complete in every respect and in conformance with all applicable requirements of the governing laws and codes B. Contract time: The Contractor may begin on-site work on, or after receipt of a written Notice to Proceed, or suitable Letter of Intent. After commencement of work, the Contractor shall pursue the Work continuously and with diligence, and bring the Project to Substantial Completion prior to date stipulated in OwnerContractor Agreement. 1. Substantial completion is the stage in the progress of the Work when the work or designated portion thereof is sufficiently complete in accordance with the Contract Documents so the Owner can occupy or utilize the Work for its intended use. This includes any and all permits required by governmental agencies necessary for occupancy and use. C. Building Permits: Contractor is responsible to ensure all required permits are obtained, and that the work pertaining to permits is properly inspected and certified.

Award

Sidewalks / Parking Lot

$2,048,000.00

Public - City

Paving, Site Work

35

27

17

2

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
672
Active Projects
314
Bidding Soon
4,933
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2021

April 26, 2021

Project location map

To Be Determined, Worcester, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.