BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in East Saint Louis, Illinois. Contact the soliciting agency for additional information.

This project requires 19% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts The Complexity Factor for this project is 0.07. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on May 5, 2021 at 9:00 AM at the Region Five/District Eight Office in Collinsville Phase I/II engineering services are required for the relocated Illinois Route 3 from 0.1 mi South of the Riverpark Connector in East St. Louis to Monsanto Ave. in Sauget for a total project length approximately 2.0 miles. This work will be broken into two sections. The first section is from 0.1 mi South of the Riverpark Drive Connector to the proposed Trendley Ave. Connector in East St. Louis is approximately 0.8 miles and is essentially all on structure. This structure will cross existing Trendley Avenue, the existing Kansas City Southern Railroad Tracks serving the adjacent existing Cargill grain elevators, the existing MetroLink light rail tracks, existing TRRA South Wye tracks and existing Riverpark Drive. The alignment is constrained by the existing Malcolm Martin Memorial Fountain on one side and multiple existing railroad tracks on the other. This work also includes a two-lane connector road from Relocated IL 3 to existing Front Street and Trendley Avenue and the demolition of an existing adjacent and abandoned railroad structure over Riverpark Drive. The second section is from 0.1 mi South of Trendley Ave. in East St. Louis to Monsanto Ave. in Sauget and is approximately 1.2 miles. This section includes a grade separation over both the TRRA and UPRR tracks located between MacArthur Bridge and Poplar Street Bridge and the latest intersection design at relocated Illinois Route 3 with both 8th Street and the approach to the Poplar Street Bridge. An additional set of TRRA RR tracks located south of Poplar Street Bridge was recently constructed and will also require a grade separation. The Consultant will be required to work with TRRA as they develop plans for a reconstructed span of the north approach of the MacArthur Bridge to accommodate the alignment of the new relocated IL 3. The estimated construction cost for this project is $90,000,000. The completion date for this contract will be 120 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Location Design Studies (New Construction/Major Reconstruction) Structure (Highway: Advanced Typical) Highways (Freeways) Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Questions concerning should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764. The method of contractor selection has not been determined at this time. IDOT - 034 - RFQ - Relocated IL 3 from South of Riverpark Drive Connector in East St. Louis to Monsanto Ave. in Sauget, Phase I/II Project, St. Clair County, Region Five/District Eight

Design

Bridges / Tunnels

$90,000,000.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
204
Active Projects
118
Bidding Soon
1,388
All Active Projects
632
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 25, 2021

August 25, 2031

img_map_placeholder

IL-3, East Saint Louis, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.