Site work and paving for a mixed-use development in Duarte, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The general nature of the work consists of furnishing all labor, material, equipment, services, and incidentals required for the roadway improvements. The scope of the work includes cold milling two (2) inches of asphalt concrete and resurfacing, localized pavement repairs as needed, adjustment of existing utility covers, installing pavement markings, constructing curb & Gutter, installing ARS & CPS for the catch basins and all appurtenant work. No bid shall be considered unless it is made on a proposal form furnished by the City of Duarte and is in accordance with the provisions of the Standard Specifications for Public Works Construction, 2018 Edition, and all supplements thereto.The City will deduct a 5 percent retention from all progress payments, The successful Contractor and his/her subcontractors will be required to possess a business license from the City of Duarte. Contractor to strictly adhere to all State labor laws. Pursuant to Labor Code section 1771.1, no contractor or subcontractor may be listed on a bid proposal for a public works project submitted unless registered with the Department of Industrial Relations. Ready-mix haulers and companies that deliver ready-mixed concrete for public works projects are considered subcontractors under Labor Code section 1722.1. Furthermore, all bidders are hereby notified that no contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations. Q&A Deadline February 19, 2021 3:26 PM (PST), Pre-Bid Meeting- No, Bid Bond- 10.00%, Payment Bond- 100.00%, Performance Bond- 100.00%, Liquidated Damages- $1000 per day Each bid must be accompanied by cash, certified or cashiers check, or bidders bond made payable to the city of duarte for an amount equal to at least ten percent (10%) of the amount bid, such guaranty to be forfeited should the bidder to whom the contract is awarded fail to enter into the contract. Cash, certified or cashiers check, or bidders bond must be scanned or uploaded to the planet bids portal when submitting the bid. The lowest/responsive bidder shall provide the original bidders bond documentation at time of award. Pursuant to the provisions of Section 1770-1777 of the Labor Code of the State of California, Director of the Department of Industrial Relations has ascertained the general prevailing rate of wages and employer payments for health and welfare, vacations, pension and similar purposes in the City in which the work is to be done. Information relative to the employment of apprentices shall be obtained from the Director of the Department of Industrial Relations, who is the Administrative Officer of the California Apprenticeship Council. The Contractor shall forfeit, as penalty to the Agency fifty dollars ($50.00) for laborers, workmen, or mechanics employed for each calendar day or portion thereof, if such laborer, workman or mechanic is paid less than the general prevailing rate of wages herein referred to and stipulated for any work done under the proposed contract, by him, or by any subcontractor under him, in violation of the provisions of the Labor Code and, in particular, Sections 1770 to 1781 inclusive. Copies of all collective bargaining agreements relating to the work as set forth in the aforementioned Labor Code are on file and available for inspection in the office of the Department of Industrial Relations, Division of Labor Statistics and Research. The City reserves the right to reject any or all bids and to waive any irregularity or informality in any bid to the extent permitted by law. Attention is directed to the provisions of Chapter 9, Division 3 of the Business and Professions Code requiring Contractors to be licensed. No proposal will be accepted from any Contractor unless he is licensed in accordance with the laws of this state. Contractor shall procure all permits incident to the lawful prosecution of the work. Further, the Labor Code of the State of California prohibits a Contractor from performing work on a public works project with a subcontractor who is ineligible pursuant to Section 1777.1 or 1777.7 of said code. Pursuant to Labor Code Section 1771.4, all bidders are hereby notified that this project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The Contractor must possess a valid Contractor's License issued by the Contractor's State Board at the time the bid is submitted. The class of license shall be applicable to the work specified in the contract. The successful bidder shall be licensed according with the provisions of the Business and Professional Code and shall possess a Class A licenses at the time this contract is awarded. The successful Contractor and his/her subcontractors will be required to possess business licenses from the Construction shall be completed within 30 working days after the Notice to Proceed is issued. The bid prices shall include all costs, including labor, materials, and all other incidental cost to complete the project, in compliance with the Bid and Contract Documents and applicable standards. All other work items not specifically listed in the bid schedule, but necessary to complete the work per bid and contract documents and applicable standards are assumed to be included in the bid prices. BIDDER understands that a bid is required for the entire work, that the quantities set forth in the Bid Schedule are to calculate total bid amount, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. Bidders shall be responsible for verifying the issuance of addenda before submitting a bid. Pursuant to Labor Code section 1771.1, no contractor or subcontractor may be listed on a bid proposal for a public works project submitted unless registered with the Department of Industrial Relations. Ready-mix haulers and companies that deliver ready-mixed concrete for public works projects are considered subcontractors under Labor Code section 1722.1. Furthermore, all bidders are hereby notified that no contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations.

Award

Roads / Highways

$343,393.00

Public - City

Paving, Site Work

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
108
Bidding Soon
2,234
All Active Projects
1,000
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2021

March 1, 2021

img_map_placeholder

Multiple Locations, Duarte, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.