BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 16, 2021 at 8:00 PM

Updated March 10, 2026

Site work and paving for a mixed-use development in Holland, Ohio. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of March 16 2021 project was not yet been awarded. It is schedule to be awarded tomorrow 3 17 2021. Part 1 The scope of work consists of milling and resurfacing 0.45 miles of Holloway Road and the replacement of approximately 4,600 feet of concrete curb and gutter. Additional work includes drive apron and walk replacement and construction of an asphalt side path, as well as related work. Part 2 The scope of work consists of the partial reconstruction of over 1,800 feet of Hamilton Drive. The partial depth reconstruction includes full depth asphalt replacement, concrete curb and gutter, drive aprons and catch basin replacement, as well as related work. Shipping and tax charges are the bidders responsibility and payable directly to Becker Impressions. The Owner and Engineer are not responsible for any errors or omissions in the contract documents or drawings obtained from any planroom other than that listed above. Failure to submit a complete set of documents could result in a bid that is determined to be nonresponsive and rejected by the Owner. The Engineer for the Project is Poggemeyer Design Group, Inc., 1168 North Main Street, Bowling Green, Ohio 43402. The estimate for the cost of construction is: $ 970,500.00.

Bid Results

Roads / Highways

$510,079.00

Public - City

Paving, Site Work

68

7

2

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
7
Bidding Soon
1,540
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2021

March 29, 2021

Project location map

Multiple Locations, Holland, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.