BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 19, 2021 at 8:00 PM

Updated October 17, 2024

Demolition, site work, renovation and addition to a parking garage in Grafton, Ohio. Completed plans call for the addition of a parking garage; for the demolition of a parking garage; for the renovation of a parking garage; and for site work for a parking garage.

Architect's Base Bid Probable Estimate of Construction Cost is: $320,000.00. Architect's Add Alternates Probable Estimate of Construction Cost is: $99,000.00 The Village of Grafton,Ohio reserves the right to waive any formalities ,accept or reject any or all bids,and to determine the lowest and/or best bid for this project. Each bidder must submit evidence of its experience on projects. of similar size and complexity,and a complete listing of all sub-contractors to be used. The Bid Form {Pg.1 through Pg.8) must be completed in its entirety and submitted in duplicate copies. Bids shall be accompanied by a certified check made payable to the Village of Grafton, Ohio in the amount of not less than 10% of the bid amount, or a bond in the full amount of the bid that substantially complies with all applicable requirements.

Award

Parking Garage

$304,300.00

Public - City

Addition, Demolition, Renovation, Site Work

20

18

2

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Panel Doors, Hardware, Door Hardware, Louvers and Vents
Division 26 - Electrical

Division 26 - Electrical

Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
73
Bidding Soon
1,143
All Active Projects
470
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2021

June 7, 2021

img_map_placeholder

1080 Cleveland St, Grafton, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.