BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and renovation of a civil project in Concord, California. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

**As of April 22, the project has been awarded with the total amount not to exceed $1,427,150.** Furnishing all labor, materials, except for those materials supplied by the District as set forth in Paragraph 01010-4.0, DISTRICT FURNISHED MATERIALS, equipment, and performing all work necessary and incidental to the construction of the project known as the Pine Hollow Reservoir 1 & 2 and Pump Station Improvements, Project Number 120042 according to drawings and specifications as prepared by the Contra Costa Water District and according to the Contract Documents. In general, the Work involves the adding a chemical feed and mixer system at one (1) reservoir, replacement of valves, grading, and safety improvements at the pump station and reservoirs. The Work includes, but is not limited to, the following: 1. The Work at Pine Hollow Reservoirs 1 & 2 and Pump Station is comprised of: a. Installation of chemical feed lines into Reservoir 1. b. Installation of mixer in Reservoir 1. c. Replacement of Reservoir 1 inlet pipe. d. Reconfiguring Reservoir 1 inlet/outlet sump. e. Replacement of twin 36-inch butterfly valve and duckbill check valve between reservoirs. f. Regrading the reservoir earthen top. g. Repairing concrete damage in Reservoir 1. h. Replacement of joint caulk in reservoirs. i. Replacement of electrical building roof. j. Replacement of surge tank. k. Installation of generator manual transfer switch. l. Replacement of gate valves at pump station vault. m. Installation of several safety improvements. 2. The Work at Gregory Gardens Tank is comprised of: a. Removal of the exterior ladder cage. b. Installation of perimeter guardrails on tank roof. 3. The Work at Kirker Pass Reservoir is comprised of installation of water quality sampling hatch. Refer to location map and Contract Drawings for information about project location. Project is to be completed within four hundred and twenty-two (422) consecutive days from the date specified in the Notice to Proceed. Time for commencement and completion of the Work is important, and is to be of the essence of the Contract. Bidder may also call the bid coordinator at (925)688-8253 or email at bidcoordinator@ccwater.com to confirm the process of obtaining hard copies of the bid documents at 2411 Bisso Lane, Concord, California. A non-refundable charge of forty-five dollars $(45.00) in the form of a check payable to Contra Costa Water District will be required for each set of documents received. *Valentine Corp. requests subcontractor bids by 2:00 p.m. on March 18, 2021.Please fax quotes to (415) 457-5820 *442 Construction Days.

Award

Water / Sewer

$1,427,150.00

Public - County

Renovation, Site Work

30

1

6

7

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
90
Bidding Soon
1,887
All Active Projects
791
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2021

May 24, 2021

img_map_placeholder

Multiple Locations, Concord, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.