BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Buckland, Massachusetts. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Contractor Qualification Highway Division 1. The project consists of the full depth reconstruction of lower Ashfield Street from north of the railroad tracks to the intersection of Clement Street. Approximately 500 feet in total length, including water, drain, and utilities improvements, concrete sidewalk, removal and rebuilding and construction of stone masonry walls, vertical granite curb construction, loam and seeding, pavement and subbase excavation, gravel backfill and paving of the existing street. 2. Furnishing and installing by boring and jacking methods a steel sleeve casing pipe consisting of approximately 80 linear feet of 36" steel sleeve and 12" HDPE DR9 water pipe and casing spacers underneath the railroad tracks. 3. Replacement by open cut methods of the water system consisting of approximately 555 linear feet of 12" Ductile Iron water main pipe, cutting in two 12"x12" Tees to existing water mains, a fire hydrant assembly, appurtenances and 1" Copper services to the property line. 4. Replacement by open cut methods of approximately 30 linear feet of 12" PVC sewer main pipe, a Precast sewer manhole, and 4" PVC services to the property line. 5. Removal and replacement of approximately 970 linear feet of concrete sidewalk and bituminous curb of Upper Ashfield Street, from School Street to Spring Street and a portion of the Ashfield Street/Green Street Intersection, with monolithic concrete sidewalk and curb, removal and resetting of Granite Curbing, wheelchair ramps, driveway aprons, sawcutting existing roadway, HMA patching. 6. Removal and replacement of approximately 260 linear feet of Bituminous Concrete walk on State Street with 5 foot wide, flush with pavement Concrete Sidewalk. 7. Removal and reset of granite curb, reconstruction of concrete sidewalk, sawcutting pavement and HMA patching to construct a wheelchair ramp at #17 State Street. 8. Removal of existing wheelchair ramp at the intersection of Clement Street and State Street, construction of a new ADA compliant concrete wheelchair ramp, reconstruction of stone masonry wall, removal and resetting of curb, sawcutting pavement and HMA patch.

Bid Results

Roads / Highways

$689,645.00

Public - City

Paving, Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
294
Active Projects
131
Bidding Soon
2,304
All Active Projects
1,012
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2021

April 12, 2021

img_map_placeholder

Ashfield St, Buckland, MA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.