Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 1, 2025 at 8:00 PM
Updated April 2, 2025
Site work for a water / sewer project in Kennewick, Washington. Conceptual plans call for site work for a water / sewer project.
UPDATE : This project will extend 1,750 LF of 30-inch water transmission main from the discharge of the Ranney Collector 5 Well site south across SR-240 and SE across US-395 (via existing 60-inch casing) connecting to the Entiat to Canal 30-inch (2019). This new transmission main will replace an aging and undersized transmission main, providing a reliable source of supply into the future. Project is in City of Kennewick capital budget fy 2025-2026 CIP ___________________________________________________________________________________ Update:https://www.go2kennewick.com/ArchiveCenter/ViewFile/Item/969 Zone 1 RC5 Supply Transmission Main- Construction, 1,270,500 Project is included City of Kennewick Fiscal Year 2023-2028 CIP ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- This project will extend 1,750 LF of 30-inch water transmission main from the discharge of the Ranney Collector 5 Well site south across SR-240 and SE across US-395 (via existing 60-inch casing) connecting to the Entiat to Canal 30-inch (2019). This new transmission main will replace an aging and undersized transmission main, providing a reliable source of supply into the future. (WSCA 1A) As of September 6, 2021 no new CIP issued, this project is currently in the FY 2021-2026 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$2,250,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2028
Multiple Locations, Kennewick, WA
Related To This Project
Kennewick, WA
--
Kennewick, WA
--
Kennewick, WA
Bid Date: Apr 25 2025
Kennewick, WA
--
Kennewick, WA
--
Kennewick, WA
Bid Date: Apr 15 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
