BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 9, 2022 at 7:00 PM

Updated March 22, 2025

Site work and paving for a mixed-use development in Hollister, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of March 9, 2022, the project has been awarded to Precision Grade for $596,336.50. The project involves the construction of traffic calming measures on Ladd Lane from Tres Pinos Road to Southside Road, and on Southside Road from San Benito Street to Ladd Lane. Traffic calming elements to be installed include slurry seal, traffic circles, rubberized curb protected bike lanes, high visibility crosswalks, and signing and striping. All work is to be done at the places and in the particular locations, of the forms, sizes and dimensions and of the materials and to the lines and as shown and delineated upon the plans and specifications made therefore and approved by the City. The Bidder shall possess a Class A with the provisions of the specifications and on itemized estimates duly certified and approved by the City Engineer submitted in accordance therewith, based on labor and materials incorporated into said work by the contractor. All proposals or bids shall be accompanied by cash, cashier's or certified check payable to the order of the City Council of the City of Hollister, amounting to ten percent (10%) of the bid, or by a bond in said amount and payable to said Clerk signed by the bidder and a corporate surety, or by the bidder and two sureties who shall justify before any officer competent to administer an oath, in double said amount and over and above all statutory exemptions The last date and time to submit questions or request for information regarding this project is set at April 1, 2021 at 5:00 p.m. Questions must be received prior to this time and date by email at renee.perales@hollister.ca.gov. All questions received after this date and time will not be answered. Engineers Estimated Cost: $846,231 to $846,231 , License Type Required: Class A Liquidated Damages: $1,000.00 Per Calendar Day , Project Duration: 90 Calendar Days Last Day for Questions: February 11th, 2022 at 5:00 pm.

Award

Roads / Highways

$596,337.00

Public - City

Paving, Site Work

12

13

2

7

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
4
Bidding Soon
1,089
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2022

March 21, 2022

Project location map

Southside Rd & Ladd Ln, Hollister, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.