BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 27, 2021 at 7:00 PM

Updated November 15, 2023

Renovation of a municipal facility in Hollister, California. Completed plans call for the renovation of a municipal facility.

Specifications and Scope of Work to Plans and IFB packet attached. Summary: Provide and install Americans with Disabilities Act (ADA) Compliant Door System. Two locations, front building doors and adjacent first floor Board Of Supervisor's Chambers entrance doors. Engineer's Estimated Cost: $36,000 to $56,000 Pre-Qualification for Bidders: Not Required Project Duration: 180 Calendar Days Liquidated Damages: $500.00 Per Calendar Day Engineer's Estimated Cost: $36,000 to $56,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. February 22th , 2022 Contract Notice to Proceed March 1st - July 15th, 2022 Construction period (Anticipated) June 15th , 2022 Substantial Completion It is the intent of the County to minimize disruptions to ongoing County operations during construction projects. A total of 120 calendar days have been allowed for this project.

Post-Bid

Municipal

$56,000.00

Public - County

Renovation

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
272
Active Projects
97
Bidding Soon
2,153
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2022

March 1, 2022

Project location map

481 4th St, Hollister, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.