BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 3, 2021 at 8:00 PM

Updated March 12, 2025

Site work and new construction of an educational facility in San Diego, California. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

The Mira Mesa High School Project estimate with an anticipated duration of construction for: GMP 1: CTE Engineering is approximately 9 months. GMP 2: Baseball/Softball Renovation is approximately 6 months. GMP 3: Whole Site Modernization is approximately 30 months. This is a PSA project, however this project does not require prequalification at this time. Subcontractor prequalification is not required at the preconstruction phase. However, subcontractor prequalification will be required for each Guaranteed Maximum Price (GMP) phase of the Project(s) and remain in good standing throughout the duration of this project. The District requires the LLB Prime Contractor to possess B or other appropriate license, of State of California Contractor License(s). The Contractor's license(s) must be active and ingood standing, at the time of best value analysis and contract award, and must remain so throughout the term of the Contract. Prior to attending the site walk, all attendees will be required to preregister with the District and self-certify utilizing a Smartsheet form (contact nethridge@sandi.net for the link to preregister). Face coverings are required. Have had no signs of a fever or a measured temperature of 100.0 degrees or greater, a cough or shortness of breath within the past 7 days. Have not travelled on an airplane within the past 14 days. Have not travelled from another country within the past 14 days Have not had "close contact" with an individual diagnosed with COVID-19: "Close contact" means living in the same household as a person who has tested positive for COVID-19, caring for a person who has tested positive for COVID-19, being within 6-feet of a person who has tested positive for COVID-19 for about 15 minutes, or coming in direct contact with secretions (e.g., sharing utensils, being coughed on) from a person who has tested positive for COVID-19, while that person was symptomatic. Have not been asked to self-isolate or quarantine by their doctor or a local public health official. All attendees will be required to washtheir hands prior to the start and at the end of the site walk at a designated washing station. No physical contact is allowed. This means, but is not limited to: handshaking, high-fives, elbow bumping or fist bumping. Gloves will be handed out to all attendees immediately after they have washed their hands. Face coverings are required to be worn by all persons (District staff and visitors) and will not be provided. Face coverings may be: bandanas, or "masks" made from home materials, such as T-shirts, pillow cases, cloth napkins. Wearing a face covering protects others that you may encounter, in case you do not realize you are infectious because you have no symptoms. These face coverings must cover one's nose and mouth. Do not touch your face covering until you remove it, and then wash your hands. Stay 6-feet apart, even with a face covering. A "No Congregation" policy is ineffect, individuals must implement social distancing by maintaining a minimum distance of 6-feet from other individuals. In areas where required social distancing is impossible, one (1) person at a time will be allowed to view a specific area. Pursuant to Resolution In Support of Service Disabled Veterans Owned Businesses (SDVOB) and Disabled Veteran Business Enterprises (DVBE) approved on May 10, 2011 by the Board of Education, the proposer is required to satisfy a minimum DVBE participation percentage of at least three percent (3%) for this project. The District reserves the right to reject any and all proposals and to waive any irregularities or informalities in any proposals or in the bidding process. No LLB Prime Contractor may withdraw his proposal for a period of 150 days after the District receives proposals.

Post-Bid

Educational

$62,202,402.00

Public - City

New Construction, Site Work

12

7

2

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
413
Active Projects
184
Bidding Soon
2,086
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2021

June 15, 2021

Project location map

10510 Marauder Way, San Diego, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.