EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 9, 2021 at 8:00 PM

Updated January 26, 2024

Site work, paving and outdoor lighting for a mixed-use development in Manchester, New Hampshire. Completed plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; and for paving for a transportation facility.

The City of Manchester, New Hampshire, Department of Aviation is seeking bids for the completion of two combined Runway Incursion Mitigation construction projects at Manchester-Boston Regional Airport. Under Schedule A, the Runway Incursion Mitigation Project - Taxiways 'A1' and 'A2' Hold Line Reconfiguration project. The scope of the work includes conduit installation, elevated Runway Guard Light relocation, in-pavement Runway Guard Light removal and installation, pavement marking removal, surface sealant and installation of new markings, HMA milling and paving, airfield signage panel relocations, ALCMS graphic modification, and turf establishment. Under Schedules B & C, the Taxiway 'H' Reconfiguration to Taxiway K (Runway Incursion Mitigation Project). The project will reconfigure the northerly portion of Taxiway H alignment from Runway 6-24 to the Runway 17 End and include construction of a new by-pass stub at the Runway 17 End and be renamed to be Taxiway K. The project will also reconfigure the Taxiway L intersection into the Northeast Ramp. The scope of the work will include: horizontal and vertical geometry modifications, new subbase and base materials for widened and new geometry layout, removal of existing pavement materials for new geometry layout, milling of existing surface pavement to remain, new bituminous pavement materials, new airport lighting systems and cabling (TW edge, TW centerline, elevated and in-pavement RGLs), new airport guidance signs and panel upgrades and cabling, ALCMS upgrades, drainage improvements, temporary erosion and sedimentation controls, new turfed areas due to new geometry layout, restoration of turf growth for all disturbed areas, pavement markings, and all other incidental items for a completed project. Bids will be accepted only from contractors that have been pre-qualified with the Department of Aviation Each bidder must deposit with his/her bid, security in the amount of 5% of the total bid. A 100% performance and payment bond will be required with the contract. In addition, a warranty bond will also be required for the contract . Prospective bidders shall RSVP, not less 24 hours prior to the meeting, through Ms. Christina Adams at the Airport Administrative Offices, who can be reached at (603) 628-6539 Ext. 307 or cadams@flymanchester.com. The virtual meeting link will be provided upon registration by the prospective bidders for attendance and shown on the download websites. No individual or group "on-site" visits will be provided for the Runway Incursion Mitigation projects Goals for minority participation for each trade: 4.0% Schedule A - Town of Londonderry, County of Rockingham Goals for minority participation for each trade: 0.7% Schedules B/C - City of Manchester, County of Hillsborough Goals for female participation in each trade: 6.9% forms provided herein: 1) The names and addresses of Disadvantaged Business Enterprise (DBE) firms that will participate in the contract; 2) A description of the work that each DBE firm will perform; 3) The dollar amount of the participation of each DBE firm listed under (1) 4) Written statement from Bidder or Offeror that attests their commitment to use the DBE firm(s) listed under (1) to meet the Owner's project goal; and 5) If Bidder or Offeror cannot meet the advertised project DBE goal, evidence of good faith efforts undertaken by the Bidder or Offeror as described in appendix A to 49 CFR part 26. All requests for information should be directed in writing to: Brian Bennett, PE, McFarland Johnson, located at 53 Regional Drive, Concord, NH 03301, by email @ bbennett@mjinc.com with a cc: copy to Carl Braley, Assistant Airport Director for Operations and Facilities, by email @ cbraley@flymanchester.com. The Owner reserves the right to waive any informality in the bidding or to reject any or all bids. MJ PROJ. No.: 18700.01

Post-Bid

Transportation Terminals

$8,000,000.00

Public - City

Outdoor Lighting, Paving, Site Work

76

21

14

7

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, Sanitary Facilities, Temporary Construction, Vehicular Access and Parking, Haul Routes, Traffic Control, Temporary Barriers and Enclosures, Temporary Fencing, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Precast Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Lighting, Interior Lighting, Special Purpose Lighting, Obstruction Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Geosynthetics for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Concrete Overlays, Fertilizing, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Soil Preparation, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Batching Equipment, Mixers, Piece Material Handling Equipment, Cranes and Hoists, Mobile Plant Equipment, General Vehicles, Maintenance Vehicles
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
252
Active Projects
136
Bidding Soon
2,619
All Active Projects
1,163
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2021

June 15, 2021

img_map_placeholder

1 Airport Rd, Manchester, NH

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Runway Incursion Mitigation Projects

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.