Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Milwaukee, Wisconsin. Design plans call for site work for a road / highway; and for paving for a road / highway.
As of April 29, 2022, an engineer has been selected and this project is in the design phase. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Solicitation No. SE-03 Project Limits : Teutonia Ave Intersection County : Milwaukee. Construction inspection of this multi-faceted modernization project to remove STH 57 overpass of STH 100, which includes excavation, grading, roadway reconstruction, and roundabout construction. Project also includes railroad crossing reconstruction near Deerbrook Trail, six traffic signal replacements, concrete overlay for the Milwaukee River bridge, and asphalt mill & overlay on STH 57 from Deerwood Drive to Mequon Road. This work is in both Milwaukee and Ozaukee County. Consultant Project Leader with 5 support staff. In 2021 a consultant project leader and 1 support staff full-time. In 2022 a consultant project leader and 5 support staff full-time. In 2023 a consultant project leader part-time with 2 support staff full-time and 1 support staff part-time. WisDOT will provide up to 2 support staff Anticipated Construction Cost: $17,000,000-$19,999,999 The contract price will be based on an estimate of the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Information on the report may be found electronically. Advertised Fixed Fee %: 7.25 The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Do not include any information that meets the definition of "trade secret" as that term is defined in s. 134.90(1)(c), Wis. Stats. Interview: Interviews will be conducted Interview Information: Questions are provided below. At least eight (8) business days before the interview, short-listed firms will be provided specific interview time and location. Interview Date:05/05/2021 Interview Place: Teleconference The method of contractor selection has not been determined at this time. WisDOT - RFP Engineering - Green Bay Rd, Village Brown Deer *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Design
Roads / Highways
$20,000,000.00
Public - State/Provincial
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 21, 2022
WI-57, Milwaukee, WI
Related To This Project
Milwaukee, WI
Bid Date: Apr 26 2022
Milwaukee, WI
Bid Date: Apr 21 2022
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Apr 22 2022
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Apr 14 2022
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Apr 27 2022
Milwaukee, WI
Bid Date: Apr 26 2022
Milwaukee, WI
Bid Date: Feb 24 2022
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Apr 04 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.