Site work and paving for a civil project in Inver Grove Heights, Minnesota. Completed plans call for paving for a road / highway; for site work for a road / highway; and water / sewer project.

As of April 27,2021 the project was awarded to Northern Lines Contracting, Inc. bid amount of $1,274,460.72. The start and completion date has not yet been determined. For furnishing of all work and materials for the consideration of City Project Number 2021-01, consisting of approximately: Restoration (Seeding & Temp Mulch) 50,000 SY Topsoil Borrow 2,800 CY Select Granular Borrow 1,000 CY 8"-10" DIP Sanitary Sewer 1,400 LF Trenchless Casing Pipe 300 LF Clear & Grub 50 TREE Clear & Grub 1 ACRE Silt Fence 4,000 LF Sanitary Sewer Manhole 160 LF 6"-16" DIP Watermain 200 LF Work on this project must be substantially completed by July 1, 2022 All work shall be completed by July 31, 2022 Bids must be on the basis of cash payment for the work and materials, and no bid will be considered unless sealed and filed with the City Clerk and accompanied by a cash deposit, certified check, or bidder's bond, payable to the City, for not less than 5% of the bid, as a guarantee that the bidder will, within fifteen (15) days after notification of the award of contract, enter into an agreement with the City and furnish a bond for the full amount of the contract as provided by law. This deposit will be subject to forfeiture as provided by law. Cash deposits, certified checks, and bidder's bonds of the three (3) lowest bidders may be retained until the contract has been awarded and executed, but no longer than 90 days from the date of opening bids. All other deposits will be refunded promptly. The City reserves the right to reject any and all bids, to waive any informality therein, and to adjourn the meeting to a later date for the purpose of further consideration of the bids and taking action thereon. No bid may be withdrawn within 90 days after the date of opening of bids. The City Council will consider award of contract at their 7 pm regular meeting held at City Hall on or after April 26, 2021 in the Council Chambers.

Award

Roads / Highways

$1,274,461.00

Public - City

Paving, Site Work

35

1

2

6

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Cleaning and Waste Management, Site Maintenance, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Compartments and Cubicles, Storage Specialties, Postal Specialties
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
59
Bidding Soon
996
All Active Projects
432
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2021

May 17, 2021

img_map_placeholder

Multiple Locations, Inver Grove Heights, MN

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2021 Trunk Utility Extensions

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.