BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 12, 2021 at 8:00 PM

Updated June 27, 2024

Renovation of an educational facility in Chapel Hill, North Carolina. Completed plans call for the renovation of a educational facility.

The project consists of the following: Replace existing 90 ton cooling tower with new 130 ton cooling tower in same location. Replace condenser water pump. Integrate cooling tower and pump into existing controls system. Provide electrical support for new equipment as required. The Owner reserves the unqualified right to waive any informalities or reject any and all proposals.

Post-Bid

Educational

$200,000.00

Public - City

Renovation

12

8

7

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
245
Active Projects
144
Bidding Soon
1,743
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2021

May 17, 2021

Project location map

101 Smith Level Rd, Chapel Hill, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.