Renovation of a water / sewer project in Fort Morgan, Colorado. Completed plans call for the renovation of a water / sewer project.
This project primarily consists of furnishing and installing a concrete wet well, intake pipe, concrete foundation, pump station and building, along with associated electrical, plumbing, hvac, and pipe installation. All questions regarding this bid should go to Matt Underwood, Superintendent of Golf, Parks and Cemetery, at (970) 518-6308. Questions must be in writing and can be e-mailed to matt.underwood@cityoffortmorgan.com. The cut-off date and time for questions is February 16, 2022 at 9:00 a.m. It is the responsibility of the prospective bidders to contact Matt Underwood to verify receipt of questions. Based upon such inquiry, the City may choose to issue an Addendum. Estimated Project Cost: $900,000- to $1,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The project consists of: 1. Furnish and install a 1,600 GPM Watertronics pump station as detailed in the drawings. Electronic butterfly valves and mechanical seals will be required. 2. Furnish and install a 14' deep 72" diameter precast concrete wet well. 3. Furnish and install 80' of 24" CL200 PVC pipe for use as the intake pipe. Note: pond is lined with PVC liner. Include liner repair at intake pipe penetration. 4. Prepare site and pour foundation and slab for the pump station and building. 5. Coordinate construction of the pump station building with selected building contractor. Stick built is the preferred construction material for the building, but alternative construction materials will be considered options as well. 6. Provide pump station set and start services from a Watertronics factory authorized service provider. 7. Connect power to the pump station from the disconnect/meter (provided by contractor) on the side of the building to the pump station cabinet. The City will supply power to the disconnect/meter at the building. 8. Furnish and install approximately 650' of 10" DR13.5 HDPE as shown on sheet 3. Connect to existing PVC mainline at three (3) locations. 9. Furnish and install mainline isolation valves as shown on sheet 3. 10. Furnish and install 4" DR13.5 HDPE filter line as shown on sheet 3. 11. Contractors and sub-contractors will be responsible for hauling off excess spoils, any soil and compaction reports, and any necessary permits required for the scope of the project.
Award
Water / Sewer
$834,566.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 25, 2022
August 1, 2022
17586 County Rd T5, Fort Morgan, CO
Related To This Project
Fort Morgan, CO
Bid Date: Mar 03 2022
Fort Morgan, CO
Bid Date: Mar 10 2022
Fort Morgan, CO
--
Fort Morgan, CO
--
Fort Morgan, CO
Bid Date: Apr 25 2022
Fort Morgan, CO
--
Fort Morgan, CO
Bid Date: Apr 28 2022
Fort Morgan, CO
Bid Date: Mar 11 2022
Fort Morgan, CO
Bid Date: Feb 03 2023
Fort Morgan, CO
Bid Date: Dec 30 2022
Fort Morgan, CO
Bid Date: Dec 09 2022
Fort Morgan, CO
--
Fort Morgan, CO
Bid Date: Nov 30 2022
Fort Morgan, CO
Bid Date: Sep 08 2022
Fort Morgan, CO
Bid Date: Oct 06 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.