Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 14, 2021 at 8:00 PM
Updated June 27, 2025
Renovation of a military facility in Los Angeles, California. Completed plans call for the renovation of a military facility.
*Contract Award Date: Jul 09, 2021 Contract Award Number: 15B60621CW9S50001 Task/Delivery Order Number: Contractor Awarded Unique Entity ID (DUNS): 064041615 Contractor Awarded Unique Entity ID (SAM): WAQ4V6QC6YJ4 Contractor Awarded Name: MIK Construction, Inc. Contractor Awarded Address: Whittier, CA USA Base and All Options Value (Total Contract Value): $1460300.00 THIS IS A SYNOPSIS OF PROPOSED CONTRACT ACTION. THIS IS NOT A SOLICITATION OR INVITATION FOR OFFERORS TO SUBMIT BIDS. THIS NOTICE WILL BE POSTED FOR A MINIMUM OF 15 DAYS PRIOR TO POSTING OF THE SOLICITATION. CRIMANL HISTORY CHECK FORMS DUE BY FRIDAY, 5/7/2021 12 NOON PST QUESTIONS DUE BY DATE CHANGED TO FRIDAY, 5/14/2021 2 PM CS The Federal Bureau of Prisons (FBOP) anticipates issuance of solicitation 15B60621B00000002 for the award of a firm-fixed-price construction contract for a project entitled Upgrade Fire Detection System at the Metropolitan Detention Center (MDC LOS ANGELES), located in Los Angeles, California. MDC Los Angeles is a federally owned facility located at 535 N. ALAMEDA ST Los Angeles, CA 90012 it is utilized for detention of both male and female occupants prior to and during court hearings as well as inmates serving sentences. Constructed in the late 1980s, MDC Los Angeles is a 10-story building with a basement, with approximately 162' of occupiable space and 272,000 square feet (SF) floor space. The work included in this contract includes but is not limited to: a. New addressable, automatic and manual fire alarm system for entire building. The Contractor will provide detailed shop drawings, prepared as a delegated-design submittal, and sealed and signed by a qualified design professional (NICET Level 3 minimum or Licensed Professional Engineer). b. The system must include a voice evacuation system as an integral part of the fire alarm system. Voice evacuation speakers are required throughout every area that requires audible notification. c. Fire-fighters two-way communication system must be provided. Firefighter's two-way communication phones must be provided throughout requires locations on every floor. d. The wiring system for this system must meet Level 3 Pathway Survivability, which will required 2-hour rated cables inside metallic conduits in this sprinklered building. All other wiring must meet Level 1 Pathway Survivability. e. The new fire alarm system will be monitored and controlled using new UL listed central monitoring and control workstation desktop computer connected to the new fire alarm system network. The Control Room will be the location of the workstation and used as an on-premise proprietary monitoring station. f. Select floors will be equipped with a Fire Alarm Control Units (FACU). The FACUs will generally serve floors above and below the floor where FACU is located. g. Select floors will be equipped with one or more remote booster power supply (NAC) units and voice evacuation amplifiers for notification appliance circuits. h. All floors above first floor will be equipped with a graphic remote annunciator near a guard stations. i. The new fire alarm network, including voice evacuation system and twoway fire-fighters communication system, will be connected as a Class X system using copper. Two-way firefighters communication system must meet Level 3 Pathway Survivability. All other wiring must meet Level 1 Pathway Survivability. j. Initiating circuits will be Class A. Each floor will have a combination of manual pull stations and automatic detectors. k. Notification circuits will be Class B. All areas must have complete notification appliance coverage throughout the building. l. Mechanical units, including roof top units and fan coil units, will be interfaced with fire alarm system for fan shut down. m. All fire sprinkler system risers flow and tamper switches will be interfaced with the fire alarm system. n. Post Indicator Valves (PIV) located on the exterior around the site will be interfaced with the fire alarm system. New underground conduit will be required for all PIV locations. o. Kitchen Fire Suppression (Ansul) systems will be interfaced with the Fire Alarm System. p. Other Fire Suppression systems, i.e. storage units with chemical or preaction systems, will be interfaced with the Fire Alarm System. q. Programming and configuration of the fire alarm network, central monitoring and control workstation, fire alarm control units and all associated devices and equipment. r. Testing, inspection and commissioning of the entire system and all associated devices and equipment. s. New 20A, 120V circuit breakers and power branch circuits from existing power panel boards to supply FACU and NAC units in each building. t. While there are some ceiling and side access panels and hatches available, the ceiling space is congested with existing utilities in many locations. Contractor will be responsible for cutting/patching of ceilings and walls will be required to install new conduit and wiring in existing ceiling spaces. u. It is expected that hazardous material, including but not limited to, lead based paints and asbestos will be present at the site. Contractor is responsible for avoiding disruptions to the hazardous material where possible. Where disruption is necessary, provide mitigation as required to complete the scope of work. v. Many of the walls are CMU/Concrete construction which will require core drilled penetrations to run the new conduit system. w. Certifications by Contractor's design professional stating that the installation was completed based on the detailed shop drawings and meets all applicable Code requirements and regulations. See the Statement of Work/Specifications attachment included with the solicitation posting (to be issued at a later date as described herein) for the complete requirements of the work. The performance period for the project will be 441 Calendar Days from issuance of the notice to proceed. The NAICS code for this requirement is 238210 with a corresponding small business size standard of $16.5 million. Pursuant to Federal Acquisition Regulation (FAR) 36.204, the estimated magnitude of the project lies between $1,000,000 and $5,000,000. (NOTE: This range is one of 8 available ranges from FAR 36.204 and is not meant to imply that the project has necessarily been estimated/budgeted to the maximum of the selected range. It merely conveys that the estimate/budget lies somewhere within that range.) The solicitation will be available approximately on or about April 23, 2021. The solicitation will be distributed solely through the Contract Opportunity website at https://beta.sam.gov. Hard copies of the solicitation will not be made available. The website provides download instructions. The "Sensitive /Secure package Upload" option will be selected for this procurement. All secure/locked documents uploaded, to include the solicitation, will require an active Beta.SAM vendor registration to obtain access. In addition, only those vendors who have been issued a valid Marketing Partner Identification Number (MPIN) from beta.SAM.gov will be granted access. If your firm does not have the NAICS code listed in beta.SAM.gov required for this solicitation, an email may be forwarded to your firm requesting an explanation as to why your firm should be granted access. If you encounter problems accessing these documents, please contact the Federal Service Desk at 866-606-8220. All future information about this solicitation, including any amendments, will also be distributed solely through this website. Interested parties are responsible for continuously monitoring this website to ensure that they have the most recent information about this proposed contract action. IMPORTANT: Any contractor interested in obtaining a contract award with the Federal Bureau of Prisons must be registered in https://beta.sam.gov. In order to qualify for award, your business size metrics information entered in your SAM registration must be less than or equal to the size standard specified above. Each bidder's beta.SAM.gov registration will be reviewed by the Government to confirm that your business size meets the small business size standard requirement. All bidders are urged to double check their beta.SAM.gov registration and update as necessary, including the size metrics information. This is a 100 percent small business set-aside. You must be registered in beta.SAM.gov as a small business (see FAR provision 52.219-1 in the Representations & Certifications section of your beta.SAM.gov registration). *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Military
$1,460,300.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2021
July 26, 2021
To Be Determined, Los Angeles, CA
Related To This Project
Los Angeles, CA
Bid Date: Jan 29 2021
Los Angeles, CA
Bid Date: Jan 29 2021
Los Angeles, CA
Bid Date: Jan 29 2021
Los Angeles, CA
Bid Date: Aug 29 2025
Los Angeles, CA
Bid Date: Jul 14 2025
Los Angeles, CA
Bid Date: Jun 27 2025
Los Angeles, CA
Bid Date: Jul 22 2025
Los Angeles, CA
Bid Date: Aug 14 2025
Los Angeles, CA
Bid Date: Jul 14 2025
Los Angeles, CA
Bid Date: Jul 11 2025
Los Angeles, CA
Bid Date: Jun 25 2025
Los Angeles, CA
Bid Date: Jun 25 2025
Los Angeles, CA
Bid Date: Jul 07 2025
Los Angeles, CA
Bid Date: Jun 27 2025
Los Angeles, CA
Bid Date: Jul 21 2025
Unlock Your Potential with Access to Commercial Construction Data
Sign up now to get free company and project data. No payment required.