EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 17, 2021 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Homestead, Pennsylvania. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

McLean Playground Drainage Improvements Phase 2, Homestead Borough: Consists of installation of 205 LF 12 storm sewer pipe, 5 new inlets, remove one existing inlet and install new inlet, all required connections, 495 LF new concrete sidewalk, 230 SY asphalt parking lot and line painting, 128 SY asphalt trench restoration, handicap & parking signage as specified, grading parking lot area, 135 SY dry well seepage pit; all items complete in place as detailed & specified. Each bid must be accompanied by a Certified Check or Bidders Bond from a Surety Company authorized to do business in Pennsylvania, made to the order of the Steel Rivers Council of Governments and/or Municipality in an amount equal to ten percent (10%) of the Proposal as a guarantee that, if the Proposal is accepted, the successful Bidder will immediately enter into Agreement after the Notice of Award of the Contract and commence start of construction immediately thereafter. Compliance is required with the Davis-Bacon Act and other Federal Labor Standard Provisions; Title VI and other applicable provisions of the Civil Rights Act of 1964; The Allegheny County MBE/WBE Program enacted July, 1981, which sets forth goals of 13 percent Minority and 2 percent Female Business Enterprise; and the Allegheny County Ordinance #6867-12, setting forth goals of 5 percent Veteran-Owned Small Businesses. Moreover, compliance is required by the prime contractor and all subcontractors with the document entitled federal General County Conditions that is included with the bid materials furnished, these federal General County Conditions to be incorporated by reference into all construction contracts between operating agency and contractor, contractor and subcontractor(s), and subcontractor(s) and lower tiered subcontractor(s). The Steel Rivers Council of Governments reserves the right to waive any informalities or to reject any or all proposals, or any part thereof. No Bidder may reject his/her bid for the period as specified in the project bid documents after the scheduled closing time for receipt of bids.

Award

Water / Sewer

$78,741.00

Public - County

Paving, Site Work

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Wall Finishes, Stone Facing, Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
66
Bidding Soon
953
All Active Projects
415
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2021

May 27, 2021

img_map_placeholder

W 12th Ave & Sarah St, Homestead, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

McLean Playground Drainage Improvements Phase 2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.