Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 12, 2022 at 8:00 PM
Updated September 14, 2023
Demolition, site work and new construction of a civil project in Burlington, Connecticut. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.
For furnishing all labor, tools, materials and equipment required for the Replacement of Covey Road Bridge Over Bunnell Brook (Bridge No. 020-012). CONTRACTOR SHALL BE PRE-QUALIFIED BY THE CONNECTICUT DEPARTMENT OF TRANSPORTATION FOR GROUP NO. 8 - MINOR BRIDGES CONSTRUCTION OR GROUP NO. 8A - BOX CULVERTS.Form 818 Standard Specifications and Supplemental Specifications may be obtained via the Connecticut Department of Transportation's website. All Proposals must be on the form furnished by the Town of Burlington and must be requested for the above-named project. Each Bidder must deposit with his/her bid a certified check, or a bid bond, for not less than five percent (5%) of the bid as provided in the Information for Bidders.THIS CONTRACT IS SUBJECT TO STATE SET-ASIDE AND CONTRACT COMPLIANCE REQUIREMENTSThe attention of the Bidders is called to the requirement for minimum wage rates to be paid under this Contract. The right is reserved to reject any or all bids in whole or in part, to award any item, group of items, or total bid and to waive any informality or technical defects, if it is deemed to be in the best interest of the Town of Burlington.No Bidder may withdraw their bid within ninety (90) days after the actual date of the opening thereof. CONTRACTORS that find discrepancies and/or errors in or between plans, specifications, quantities and other matters, must immediately notify Scott Tharau, Director of Public Works, 200 Spielman Highway, Burlington, CT 06013 or at tharau.s@burlingtonct.us in writing not less than ten days before the scheduled bid opening. Estimated Budget: $750,000 to $1,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Bridges / Tunnels
$620,711.00
Public - City
Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
