BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and renovation of a water / sewer project in Irvine, California. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The project shall consist of rehabilitating the HATS Diversion Structure and lining the MWRP Primary Clarifiers 1-5 influent and effluent channels. Work shall include but not be limited to sewer flow bypass, traffic control, repair and relining the HATS Diversion Structure, removal and installation of new slide gates at the HATS Diversion Structure, repair and relining of the Bypass Manhole and Junction Structure, repair and relining of the clarifiers channels, and testing. Bids will be accepted for this Project only from the prequalified bidders on the Project Bidders List. Prequalification to be placed on the Project Bidders List for this Project is closed. Start/Delivery Date Notice of Award Project Duration 450 calendar days from the date of the Notice of Award Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 04/29/2021 2:00 PM (PDT) The CONTRACTOR shall perform all concrete rehabilitation work at the locations shown. In addition, the CONTRACTOR shall perform all appurtenant work, including surface preparation, reinforcing corrosion protection, priming, finishing and curing of the rehabilitation work. A. The HATS Diversion Structure Rehabilitation Project is located within the City of Irvine on Main Street just west of Harvard Avenue. B. Primary Clarifiers 1 through 5 are located at the Michelson Water Recycling Plant. The work to rehabilitate the existing HATS Diversion Structure and line the clarifier influent and effluent channels shall generally include but is not limited to the following: Sewer Flow Bypass Traffic Control Relining interior of Diversion Structure Removal and installation of new slide gates Repair and relining of Bypass Manhole and Junction Structure Relining clarifier channels Testing

Award

Water / Sewer

$1,827,750.00

Public - County

Renovation, Site Work

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
235
Active Projects
111
Bidding Soon
2,428
All Active Projects
1,083
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2021

July 5, 2021

img_map_placeholder

To Be Determined, Irvine, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.